66.
Place and align rear and side facia for best possible fit with rear capping side facia. Attach facia
to rafter ends with
6 - 1 1/2” Finishing Nails
per piece. Complete both rear facia pieces.
67.
Position first
Roof Ridge Board
(1/2” x 4 1/2” x 51 5/8”)
at the front of roof to cap off shingles
and facia. Ridge Boards should meet on seam of roof panels. When aligned correctly, attach with
4 - 1 1/2” Finishing Nails
per piece.
68.
Attach
Facia / Detail Plates
to cover seams where Front and Rear Facia pieces come
together. Secure with
4 - 1 1/2” Finishing Nails
per piece.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 31