10.
Starting on side, position a
Solid Wall Panel
on top of plywood floor.
The Wall Panel bottom framing will sit flush with floor framing. Wall siding will
overhang the floor.
Important:
Make sure all walls are aligned in their
upright position. If not, water may leak into your shed. Unsure if panel is
facing up or down? Recently attached Bottom Plate is on bottom of panel.
11.
Outside 2x3 framing of wall panel should be flush with outside of floor framing when properly
aligned.
Note:
Do not align wall siding to floor. Align wall plate to outside of plywood floor. When
positioned correctly, locate 2nd Solid Wall Panel and place in corner.
Wall Plate Flush
with floor framing.
Do not align
wall siding to
floor. Align
wall plate to
outside of
plywood floor.
12.
Butt both vertical wall studs of side and rear walls together and attach with
3 - 2 1/2” Screws
.
Screw at the bottom, middle and top of stud to secure properly. Have helper push wall framing
together while securing to ensure tight fit.
Note: Drill pilot holes in studs to prevent splitting
.
Rear Solid W
all
Side Solid W
all
Do Not Attach Walls To
Floor until Step 30.
Optional
- Caulking
seams will help prevent
moisture from entering
your shed. Caulking not
included in kit.
Pilot Hole
first.
W
all Plate
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 10