![OLT GS84-S Скачать руководство пользователя страница 21](http://html1.mh-extra.com/html/olt/gs84-s/gs84-s_assembly-manual_3876484021.webp)
38.
Correctly orientate Left Side Roof Panel, with shingles overhanging plywood on the side of the
shed and flush with plywood to the middle. Place on rafters with front of plywood just about flush with
rafter ends but just slightly recessed. Doing so allows front facia to sit better.
39.
For correct Roof Panel position, align panel so plywood sits evenly on Center Rafters. Complete
both roof Panels.
40.
With Roof Panels aligned, screw panels down to center rafters with
2 - 2 1/2” Screws
in
Bottom
Row of Shingles Only (1 screw per panel).
Plywood flush
with shingles
on inside.
Rear of plywood
1/8” recessed
with rafter end.
Shingles overhang plywood on outside.
Nailing strip to outside edge.
Roof Panel centered
on rafter.
Push tight together.
Roof Seam.
Screw Bottom Row of
Shingles ONLY for now.
Screw on angle away
from shingle edge to
prevent it from cracking.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 21