4430 Planer
OLIVERMACHINERY.NET
37
|
Page
Maintenance
Routine maintenance keeps your planer in top shape. Please follow the maintenance schedule below,
and use the maintenance record worksheet attached in the back of the manual to document all tasks
completed.
NOTICE:
Maintenance schedule may vary for individual users due to different situations and
safety requirements.
WARNING
Disconnect the machine from the power source before any maintenance work is
performed. After servicing the planer, remove all wrenches and tools before
restarting the machine. Failure to comply can cause serious injury!
Maintenance Schedule
Interval
Component
Every day
Remove dust buildups from the planer and dust collection system.
Inspect the power cord for signs of aging and damages. Replace as needed.
Every week
Inspect and clean cutterhead, rollers, and anti-kickback fingers. Remove any
dust and resin accumulation.
Inspect/rotate/replace worn cutter inserts.
Apply rust protectant on unpainted cast iron surfaces.
Verify extension tables are level with the planer bed. Adjust as needed.
Every month
Check V-belt tension and replace if the belt shows signs of cracking or glazing.
Every 4-6 months
Remove dust buildups from the motor and the cabinet.
Inspect headstock chain for chain slacks.
Check parallelism between the table and cutterhead, and the rollers.
Notice
: Motor bearings are permanently sealed and lubricated, and do not require lubrication.
Lubrication Schedule
Component
Interval
Types of Lubricant
Reference
A - Return roller shafts
Every week
SAE 30 oil.
Figure 1
B - Feed roller shafts
Every 30 hours
SAE-30 oil.
C - Drive chains and
sprockets
Monthly
General purpose grease
Figure 2
D - Lead screws (x4)
Once every 3 months
General purpose grease
E - Columns (x4)
Clean and lubricate
weekly
A light coat of SAE-30 oil
F - Gearbox
Replace gearbox oil
after the first 50 hours of
use, then replace the oil
every year.
Standard gear oil, 70-90 weight.
Remove gearbox cover to access drain plug
and fill plug. Drain and recycle used oil. Refill oil
until it reaches the fill plug.
Figure 3
G - Outfeed roller
Clean and
lubricate as
needed.
A very light coat of SAE-30 oil.
Figure 4
H - Infeed roller
I - Anti-kickback fingers
J - Bed roller
Figure 5
K - Headstock chain
and sprockets
Every 4 to 6
months
Grease, or good quality cycle chain lubricant.
Remove the motor access panel to access
components.
Figure 6
Содержание 4430.201 M-4430
Страница 2: ......
Страница 10: ...10 Page Oliver Machinery 4430 Planer Identification...
Страница 11: ...4430 Planer OLIVERMACHINERY NET 11 Page...
Страница 12: ...12 Page Oliver Machinery 4430 Planer...
Страница 38: ...38 Page Oliver Machinery 4430 Planer Figure 1 Figure 2 Figure 3 Figure 4 Figure 5 Figure 6...
Страница 50: ...50 Page Oliver Machinery 4430 Planer Wiring Diagram...
Страница 51: ...4430 Planer OLIVERMACHINERY NET 51 Page Parts List Table Assembly...
Страница 52: ...52 Page Oliver Machinery 4430 Planer Cabinet Assembly...
Страница 53: ...4430 Planer OLIVERMACHINERY NET 53 Page Motor Mount Assembly...
Страница 54: ...54 Page Oliver Machinery 4430 Planer Headstock Assembly...
Страница 55: ...4430 Planer OLIVERMACHINERY NET 55 Page Gearbox Assembly Cover and Dust Hood Assembly...
Страница 62: ...62 Page Oliver Machinery 4430 Planer Maintenance Record Date Task Operator...
Страница 63: ...4430 Planer OLIVERMACHINERY NET 63 Page Notes...