![Oilon GKP-50 MH Скачать руководство пользователя страница 25](http://html1.mh-extra.com/html/oilon/gkp-50-mh/gkp-50-mh_operation-and-maintenance-manual_3565520025.webp)
The assembly may vary depending on the scope of delivery.
To assemble the gas module:
Gas module parts are connected to each other with threaded connections. Use thread
seal to seal the connections (for example Loctite 577).
1. Screw the gas inlet pipe to the mounting flange (1.1).
2. Screw the elbow fitting to the gas inlet pipe. Adjust the fitting to point straight to the
right, in gas flow direction (when gas inlet to burner is on the right).
3. Screw the elbow part (4.2) of the adjustable elbow fitting and adjust it to point
upwards.
a029409 ver. 1
Pos.
Item
Pos.
Item
5
2nd stage oil valve
13
Cable gland for gas high
pressure switch
6
1st stage oil valve
14
Gas valve cable gland
7
Main oil valve
15
Injector hoses
8
Gas high pressure switch
16
Hinge locking screw
9
Gas low pressure switch
17
Control unit
10
Manual shut-off valve
a
Flame detector gland
11
Gas valve assembly with pressure regulator
b
Gas damper servo gland
12
Cable gland for gas low pressure switch
c
Lead in plate
To mount the gas module to the burner:
1. Screw the coupling unit (4.1) of the adjustable elbow fitting to the burner gas frame.
The nut (4.3) must be with the coupling unit.
2. Lift the mounted gas module to the adjustable elbow fitting.
3. Check that the gasket (4.4) is in its place and undamaged.
4. Connect the gas line by screwing the nut (4.3) to the elbow part (4.2).
M5164 1640EN
23 (95)
Содержание GKP-50 MH
Страница 2: ......
Страница 21: ...3 3 Installing burner GKP 50 MH main dimensions D048897 ver 3 M5164 1640EN 19 95...
Страница 98: ...96 95 M5164 1640EN...
Страница 99: ......
Страница 100: ...Tarmontie 4 FI 15860 HOLLOLA FINLAND Tel 358 3 85 761 Fax 358 3 857 6239 Email info oilon com www oilon com...