2 Installation
2.1 Installation site
Site planning and selection
● Install the unit and the associated equipment in a warm, dry place.
● The installation site’s ambient temperature must be 5...+40 °C (non-
condensing).
● No condensate should accumulate onto the unit’s components from ambient air
(non-condensing atmosphere).
● The air at the installation site should be free of harmful quantities of dust or other
substances that may influence the heat pump’s performance, durability, or safety.
Unit base and leveling feet
Place the unit on a stable, steady base that can carry its entire weight. Mount the unit
securely in a vertical position onto its own leveling feet. Level the machine using the
machine’s leveling feet.
Maintenance and access clearance
The system must include shut-off valves that allow the unit to be isolated from the brine
circuit, heating circuit, and the domestic water system.
The unit should be easy to access for servicing from all sides. For ease of access:
● leave a sufficient clearance on all sides of the unit, or
● ensure that the compressor unit can be detached and moved to a location that has
enough space for servicing.
● Leave at least 80 cm of clearance in front of the unit.
● Leave at least 2 cm of clearance between the unit and any surrounding walls.
Access clearance ver. 1
Pos.
Item
HP
Heat pump
A
Cupboard, appliance, or
other object
10 (54)
M8006 2123EN
Содержание CUBE 10 EasyAce
Страница 1: ...M8006 2123EN 10 June 2021 CUBE and ECO INSTALLATION AND COMMISSIONING...
Страница 2: ......
Страница 51: ...Pump curves Wilo Yonos PARA GT 7 5 Grundfos UPMXL GEO 25 125 M8006 2123EN 49 54...
Страница 57: ......