4
- 2.
Connection utility sources
(1) Power connection
Please connect the adapter cable to the connector as shown on right.
(2) Air supply connection
Please use plastic tubes of outer diameter φ6mm to connect
to the air regulator. Please set the pressure to 0.5MPa.
Lift the cap of the air regulator (upwards), and the lock will be
released. After settings is done, fasten the cap down again to
lock the regulator.
4
- 3.
Connecting I/F cable and screw delivery tube
(1) Screw feeder
Connect the attached I/F cable to the rear surface and fix
it with screws. Attach the screw delivery tube to the screw
outer port on the front and fix it with a fixing band.
(2) Shoot box
Connect the attached I/F cable to the top surface and fix
it with screws. Connect the screw deliver tube firmly to the
tube inlet on the top.
Be careful when routing the tube, as
sharp bending or strong tightening with a cable tie can
cause screw clogging.
DC jack
Air inlet
screw delivery tube
I/F cable
4. Installation
4
- 1.
Installation of the shoot box
Φ28 metal joint mounting bracket is attached to the back of
the shoot box. It can be attached to a φ28 ejector pipe. Also,
if you remove this mounting bracket, you can install it using
the 4 screw holes of M4.
The installation location should be within the reach of the I / F
cable (2.5m) between the screw feeder and the shoot box.
㸿㸱
B
㸯㸱㹱
ಶᩘ㸸
ᑍἲ㸸
ᰴᘧ♫ࠉṊ࣭࣮ࣝࢺᕤᴗ
⇕
ฎ
⌮
ᣦᐃ௨እࣀᑍἲࢽᑐࢫࣝᑍἲᕪࠉࠉ㸦s㸧
➼⣭
ࣚࣅᑍἲ
௨ୗ
ᅗ
␒
సᡂᖺ᭶᪥
ရ
〇
ᅗ
〇
ィ
タ
ᅗ
᳨
ㄆ
ᢎ
ኚࠉ
᭦
ࠉグ
ࠉ
ኚ᭦⪅
ྡ
㠃
⾲ ฎ
⌮
ୖ
ᮦ
㉁
ᐃ
ᣦ
➼
⣭
ゅ
ᗘ
ᑻ
ᗘ
㸮⣭ 㸯⣭ 㸰⣭ 㸱⣭ 㸲⣭ 㸳⣭
ࣤࢥ࢚ࠉ
࣐ࢹ
ࣤࢥ࢚ࠉ
࣐ࢹ
ࣤࢥ࢚ࠉ
࣐ࢹ
ࣤࢥ࢚ࠉ
࣐ࢹ
ࣤࢥ࢚ࠉ
࣐ࢹ
㒊
ရ ྡ
ぶ
␒
㒊
ᖺ᭶᪥
ኚ᭦␒ྕ
ᢎ
ㄆ
φ 28 pipe, etc.
㸿㸱
B
㸯㸱㹱
ಶᩘ㸸
ᑍἲ㸸
ᰴᘧ♫ࠉṊ࣭࣮ࣝࢺᕤᴗ
⇕
ฎ
⌮
ᣦᐃ௨እࣀᑍἲࢽᑐࢫࣝᑍἲᕪࠉࠉ㸦s㸧
➼⣭
ࣚࣅᑍἲ
௨ୗ
ᅗ
␒
సᡂᖺ᭶᪥
ရ
〇
ᅗ
〇
ィ
タ
ᅗ
᳨
ㄆ
ᢎ
ኚࠉ
᭦
ࠉグ
ࠉ
ኚ᭦⪅
ྡ
㠃
⾲ ฎ
⌮
ୖ
ᮦ
㉁
ᐃ
ᣦ
➼
⣭
ゅ
ᗘ
ᑻ
ᗘ
㸮⣭ 㸯⣭ 㸰⣭ 㸱⣭ 㸲⣭ 㸳⣭
ࣤࢥ࢚ࠉ
࣐ࢹ
ࣤࢥ࢚ࠉ
࣐ࢹ
ࣤࢥ࢚ࠉ
࣐ࢹ
ࣤࢥ࢚ࠉ
࣐ࢹ
ࣤࢥ࢚ࠉ
࣐ࢹ
㒊
ရ ྡ
ぶ
␒
㒊
ᖺ᭶᪥
ኚ᭦␒ྕ
ᢎ
ㄆ
M4 screw hole
- 8 -
interface cable
connector
screw delivery tube
tube inlet