EXPLORE
E6 & E7
.
2021 INSTALL & OPERATION MANUAL
13
4.5 CONTROL SYSTEM INSTALLATION
Switch Control
Additional items required not supplied by OceanLED:
•
Push switch (Normally open, momentary type).
To use Switch Control, the Explore Control Input Cable and Terminator Kit is required.
To connect the lights to enable control of all lights using a single switch, Explore E6 & E7 Control Link Cables
must be used. The quantity of Control Link Cables required per installation is equal to the number of lights
minus 1 (Example: If 10 lights are used, 9 control link cables are required). Please consult the Explore E7
Light Choice Diagram in the Appendix (Section 7) for details.
Ensure power is disconnected before attempting to connect or solder any wire.
1. Connect one contact of the switch to the red wire of the Explore Input Control Cable. Connect the black
(Ground), yellow (DMX +) and brown (DMX -) wires together and connect to the other contact of the switch:
2. Plug the Switch cable to the
‘Control In’ Connector of the first light.
3. Using the Control Link Cable, connect the
‘Control Out’ of the first light to ‘Control In’ of the next light. Repeat
until all the lights are connected. Check the diagram below for clarification.
4. Plug the Explore Terminator to the
‘Control Out’ of the last light.
Control Link Cable
Control Link Cable
Switch
12/24V DC Power
12/24V DC Power
12/24V DC Power
Terminator