
NXP Semiconductors
UM11183
KITFS85SKTEVM evaluation board
UM11183
All information provided in this document is subject to legal disclaimers.
© NXP B.V. 2019. All rights reserved.
User guide
Rev. 2.0 — 20 February 2019
42 / 50
8.4.6 INIT safety
This tab allows you to manage all registers that can be configured to close the
initialization phase. Note that the initialization phase is closed by the first good watchdog
refresh before 256 ms timeout.
Figure 36. INIT safety
8.4.7 Diag safety
The watchdog type configured in the OTP has to be manually selected in the drop-
down list to play with the watchdog features. If the user is not aware about the type of
watchdog configured in the OTP, it can be found in TestMode:Mirrors_Failsafe and
Miscellaneous tabs.