12.3 – CLEARANCES TO SHELVES & COMBUSTIBLE MATERIALS 

a.

   We do not recommend the use of combustible shelves in this application.* 

b. 

We do not recommend the use of a

 non-combustible 

shelf in this application.  However, see section 13 which shows the 

 

application where a 

non-combustible

 shelf is used.*

 

c.  

Any combustible sidewall must be at least 500mm from the inside of the builders/fireplace opening. 

d.

   With all heating appliances, soft furnishings, decorations and wall coverings may discolour or scorch if placed too close. 

e.

   No combustible material, e.g. curtains must be closer than 500mm to the builders opening. 

 
*The wall between the sealing frame and any shelf would become hot. Therefore, we do not recommend any shelves with this type 
of installation.

 

 
12.4 - FITTING THE FIREBOX

 

a.

   It is very important that the sealing frame makes a good seal against  the wall to ensure the fire can seal against the Sealing 

      Frame. There is silicone sponge sealing strip already affixed to the relevant surfaces of both items to ensure a good seal.   
 

Ensure this silicone sealing strip stays in place during installation. 

b.

   Secure the Sealing Frame to the wall with the screws and rawlplugs provided ensuring it is positioned centrally in the Builders 

Opening. 

c.

   Make sure that the silicone sealing strip stays in position, around the flange on the Sealing Frame, to create a seal to the wall 

around the builders opening. 

d.

   If the silicone sealing strip is not compressed and there are gaps they must be filled with a suitable sealant, fireclay or high 

temperature silicone. Wall staining may occur if the seals are not compressed and the flue draw will be compromised. 

e.

   Slide the Fire 

part way 

through the Sealing Frame (leaving it sticking out approximately 50mm) ensuring the gas supply pipe and 

isolation/pressure test elbow clears through the cut out in the rear of the Fire and does not foul on the control. 

f. 

Lift the Fire slightly and slide it home ensuring that the sealing strip along the front edge of the underside of the Fire

 

stays in  

position to make a seal between the Fire and the sealing frame

.

 

g.

  Ensure that the silicone sealing strip on the rear of the Fire outer frame stays in position to create a good seal between the Fire 

and the Sealing Frame.

 

h.

   Secure the Fire to the Sealing Frame with the screws provided. 

i.  

Refit the burner mounting plate assembly by first putting the Receiver  through the opening then tilt the assembly and slide it into  

      the fire and secure with the 4 screws. Take care not to mark the liners in the fire. Place the Receiver to the left side at the front.  

j.  

Connect the isolation/pressure test elbow to the control valve and with it fully open check the joint for gas soundness. 

k. 

Check that all gas connections are sound. The appliance has been factory tested; however the connections may have been  

 

disturbed in transit or storage. 

 
 

! IMPORTANT NOTE ! 

Always reseal the pressure test point and check that it is gas tight.

  

(This accounts for a lot of recalls.) 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

                                                                                                                                                                                                                                                             

 

Содержание SYNERGY ELLESSE

Страница 1: ...FIRE IS HEAVY AND ASSISTANCE SHOULD BE SOUGHT WHEN LIFTING ALL INSTRUCTIONS MUST BE LEFT WITH THE USER FOR SAFE KEEPING MANUFACTURED by Nu Flame Limited Unit 4 Kimpton Trade Business Centre Minden Ro...

Страница 2: ...12 Hole in the Wall Installations for Steel Glass Trim Styles 12 With Appropriate Sealing Frame 13 Hole in the Wall Installations for Echo Trim Style 14 14 Hole in the Wall Installations with Marble...

Страница 3: ...rone to being chipped or scratching 1 2 Removal of Components a Fires Ordered with Steel or Glass Trims i The Outer Door will have to be removed and stored carefully to allow access for removal of the...

Страница 4: ...he Fire can be installed into a suitably designed fire surround with a 150 C Rating v Take care with some Micro Marble Materials claiming a 150 C Rating as they may give off odours blister or discolou...

Страница 5: ...nked by arrow Please note that you can have the flame height anywhere between maximum and preset low For fine adjustment simply tap the large and small flame buttons d Switching Off Press the red off...

Страница 6: ...esent room temperature the fire will go straight to the Standby Setting until the temperature drops below the Set Temperature at which point the main burner will relight Note The Room Temperature is s...

Страница 7: ...ELDERLY OR INFIRM OR PETS ARE LEFT IN ATTENDANCE 3 5 RESETTING THE MERTIK MAXITROL LOGIC CIRCUITS IF THE HANDSET DOES NOT WORK APPLIES TO BOTH CONTROL SYSTEMS Must only be done when the fire is Cool B...

Страница 8: ...of the door Follow instructions in section b above e The logs must not be cleaned or moved f The outer surfaces of the fire can be cleaned with a damp lint free cloth do not use abrasive cleaners IMPO...

Страница 9: ...FORE PROCEEDING WITH THE INSTALLATION READ THESE INSTRUCTIONS CAREFULLY THESE INSTRUCTIONS SHOULD BE LEFT WITH THE USER FOR SAFE KEEPING AND FUTURE SERVICING PRIOR TO INSTALLATION ENSURE THAT THE GAS...

Страница 10: ...Height mm Synergy Ellesse Echo Trim with Metal Door 1140mm 540mm Synergy Ellesse Echo Trim with Glass Door 1140mm 540mm Synergy Ellesse Steel Trim No Sealing Frame 1135mm 560mm Synergy Ellesse Steel...

Страница 11: ...PPLIANCE SEEK EXPERT ADVICE 10 VENTILATION a No additional purpose provided ventilation is normally required for the fire when installed in the UK however this must be confirmed by the Spillage Test s...

Страница 12: ...rials d No combustible materials must present in the builders opening e The base of the builders opening must be flat level and square to the wall f The builders opening should have provision for a ga...

Страница 13: ...rs opening d If the silicone sealing strip is not compressed and there are gaps they must be filled with a suitable sealant fireclay or high temperature silicone Wall staining may occur if the seals a...

Страница 14: ...placed too close e No combustible material e g curtains must be closer than 500mm to the builders opening The wall between the sealing frame and any shelf would become hot Therefore we do not recomme...

Страница 15: ...with a suitable sealant fireclay or high temperature silicone j Refit the burner mounting plate assembly by first putting the Receiver through the opening then tilt the assembly and slide it into the...

Страница 16: ...ng structural check may be required c The builders opening must be constructed from Non combustible materials d No combustible materials must present in the builders opening e The base of the builders...

Страница 17: ...ay in position to make a seal against the top edge of the slip at the base of the builders opening and the front face of the slips where they locate against the rear of the Fire outer frame While slid...

Страница 18: ...any rendering building work is allowed to thoroughly dry out before Installation IMPORTANT Dry lined walls ensure that any air gaps between the back of the plasterboard and wall are sealed around the...

Страница 19: ...slightly and slide it home ensuring that the sealing strips on the underside of the front riser channel and the rear of the Fire outer frame stay in position to make a seal against the base of the fi...

Страница 20: ...y Breast will occur e The Wall Mounted Television must be mounted on a suitable bracket or angled bracket that meets the Television Manufacturer s requirements and spaces the Television at least 35mm...

Страница 21: ...osition for a Wall Mounted Television Must meet the Installation Requirements of these Instructions e The Nu Flame Television Glass Heat Shield is only suitable for the Nu Flame Synergy Range of Gas F...

Страница 22: ...the Fire s Installation Instructions and the Fire Surround meets the Minimum Dimensions as detailed in the Diagrams Below b You Must take account of the Television Manufacturer s Installation requirem...

Страница 23: ...fuel tray g Place the large rear log No 1 to the rear of the fire on the fuel tray ensuring that the cut out in the log sits behind the pilot shield and that it is central about the burner h Place lo...

Страница 24: ...n the log support at the front k Place log No 5 next to log No 6 locating it on the peg and the cut out in the rear log l Place the last log No 4 so that it locates on the central peg and rests in the...

Страница 25: ...Emberglow material is a consumable material and as a limited life You can buy replacements through your local Nu Flame Ltd Stockist or Installer q For Synergy Perspective Glass Wall Mounted Installati...

Страница 26: ...m or adjacent rooms running at high The fire should continue to clear its combustion products Also operate any other flued appliance in the same or neighbouring rooms and ensure they continue to funct...

Страница 27: ...ii Now secure the upper Hinge Pin with the fixing screw provided as shown the door should then be closed and held shut by the magnet catches Very Important The Hinge Pin Screw Must be fitted to ensur...

Страница 28: ...SES WHEN LIT 20 SERVICING 20 1 GENERAL Note Servicing must be carried out by a registered installer a The fire does not have to be removed for Servicing b Check the operation and ignition of the fire...

Страница 29: ...Burner Control Assembly to Nu Flame for rectification as this could be the least cost option 21 3 PILOT GOES OUT AFTER FIRST LIGHTING a Check there is no vermiculite blocking the flame to the thermoco...

Страница 30: ...ork d Change the Handset and or Receiver and or Burner Control System Important In instances where it is indicating that either of the main control systems need changing you should investigate returni...

Страница 31: ...5 4 The fire must be Installed serviced by a properly qualified in accordance with Local National Codes Installation Engineer and in accordance with these Installation Instructions Supplier Nu Flame L...

Страница 32: ...fire must be Installed serviced by a properly qualified in accordance with Local National Codes Installation Engineer and in accordance with these Installation Instructions Supplier Nu Flame Limited...

Страница 33: ...33 23 DIAGRAM OF INFRARED CONTROL SYSTEM...

Страница 34: ...elivery to us We will not be liable for any such breakages or losses Under no circumstances should any attempt be made to repair the burner on site without our express knowledge and approval during th...

Отзывы: