Nu-Flame SYNERGY ELLESSE Скачать руководство пользователя страница 10

10 

 

8.2 The Synergy Ellesse is available with various Trim Styles with Glass or Metal Door Options. 
       Some Styles also have a Sealing Frame Option (Normally used for Wall Mounted Installations). 

 

The general dimensions are shown with a table below showing the minimum flat area required around the Fireplace Opening 

 The Synergy Ellesse Steel & Glass Options can be supplied with or without the Sealing Frame for different applications. 
 The Synergy Ellesse Steel can only be Installed below a Wall Mounted Television if Installed in a Suitable Fire Surround. 
 All other Trim Options can be Installed below a Wall Mounted Television be it in a suitable fire surround or wall mounted subject to   
 specific requirements which should be discussed with your Nu-Flame stockist and subject to the requirements in these Instructions.   
 
  The Side Views show how far the Trims project from the wall. 
 

 

 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 
 
 
 

 
Minimum Flat Sizes for Doors & Frames (Central Around Opening)  
 

  
                                                                                                                          

Width (mm)

                    

Height (mm)  

 

Synergy Ellesse Echo Trim with Metal Door

                                                  1140mm                          540mm 

Synergy Ellesse Echo Trim with Glass Door

                                                 1140mm                          540mm 

 

Synergy Ellesse Steel Trim (No Sealing Frame)

                                            1135mm                          560mm 

Synergy Ellesse Steel Trim (With Sealing Frame)

                                           970mm                          630mm 

 

Synergy Ellesse Glass Trim (No Sealing Frame or Shelf)

                               980mm                          550mm 

Synergy Ellesse Glass Trim (With Sealing Frame & Shelf) 

                            980mm                          605mm 

 

Note: 

Where a the Synergy Ellesse Steel or Glass Trims combinations is to be Installed in a Fire Surround a Riser Plate Must 

have been specified which will raise the fire by 30mm to allow for the Metal or Glass Door to open clear of the Hearth.  
 

Note: 

Where a the Synergy Perspective Glass Trim is to be Wall Mounted the Glass Shelf will be supplied and 

Must 

always be 

fitted. 
 

Note: 

This does not take account of any up stand that may be present around the Hearth for which a greater height allowance 

may be required. More detail is provided in Section 15. 
 
       

SYNERGY ELLESSE 
WITH ECHO FRAME & GLASS DOOR 

SYNERGY ELLESSE STEEL 
(AVAILABLE WITH OR WITHOUT SEALING FRAME  

SYNERGY ELLESSE  
WITH ECHO FRAME & METAL DOOR  

SYNERGY ELLESSE GLASS  
(AVAILABLE WITH OR WITHOUT SEALING FRAME & GLASS SHELF  

Содержание SYNERGY ELLESSE

Страница 1: ...FIRE IS HEAVY AND ASSISTANCE SHOULD BE SOUGHT WHEN LIFTING ALL INSTRUCTIONS MUST BE LEFT WITH THE USER FOR SAFE KEEPING MANUFACTURED by Nu Flame Limited Unit 4 Kimpton Trade Business Centre Minden Ro...

Страница 2: ...12 Hole in the Wall Installations for Steel Glass Trim Styles 12 With Appropriate Sealing Frame 13 Hole in the Wall Installations for Echo Trim Style 14 14 Hole in the Wall Installations with Marble...

Страница 3: ...rone to being chipped or scratching 1 2 Removal of Components a Fires Ordered with Steel or Glass Trims i The Outer Door will have to be removed and stored carefully to allow access for removal of the...

Страница 4: ...he Fire can be installed into a suitably designed fire surround with a 150 C Rating v Take care with some Micro Marble Materials claiming a 150 C Rating as they may give off odours blister or discolou...

Страница 5: ...nked by arrow Please note that you can have the flame height anywhere between maximum and preset low For fine adjustment simply tap the large and small flame buttons d Switching Off Press the red off...

Страница 6: ...esent room temperature the fire will go straight to the Standby Setting until the temperature drops below the Set Temperature at which point the main burner will relight Note The Room Temperature is s...

Страница 7: ...ELDERLY OR INFIRM OR PETS ARE LEFT IN ATTENDANCE 3 5 RESETTING THE MERTIK MAXITROL LOGIC CIRCUITS IF THE HANDSET DOES NOT WORK APPLIES TO BOTH CONTROL SYSTEMS Must only be done when the fire is Cool B...

Страница 8: ...of the door Follow instructions in section b above e The logs must not be cleaned or moved f The outer surfaces of the fire can be cleaned with a damp lint free cloth do not use abrasive cleaners IMPO...

Страница 9: ...FORE PROCEEDING WITH THE INSTALLATION READ THESE INSTRUCTIONS CAREFULLY THESE INSTRUCTIONS SHOULD BE LEFT WITH THE USER FOR SAFE KEEPING AND FUTURE SERVICING PRIOR TO INSTALLATION ENSURE THAT THE GAS...

Страница 10: ...Height mm Synergy Ellesse Echo Trim with Metal Door 1140mm 540mm Synergy Ellesse Echo Trim with Glass Door 1140mm 540mm Synergy Ellesse Steel Trim No Sealing Frame 1135mm 560mm Synergy Ellesse Steel...

Страница 11: ...PPLIANCE SEEK EXPERT ADVICE 10 VENTILATION a No additional purpose provided ventilation is normally required for the fire when installed in the UK however this must be confirmed by the Spillage Test s...

Страница 12: ...rials d No combustible materials must present in the builders opening e The base of the builders opening must be flat level and square to the wall f The builders opening should have provision for a ga...

Страница 13: ...rs opening d If the silicone sealing strip is not compressed and there are gaps they must be filled with a suitable sealant fireclay or high temperature silicone Wall staining may occur if the seals a...

Страница 14: ...placed too close e No combustible material e g curtains must be closer than 500mm to the builders opening The wall between the sealing frame and any shelf would become hot Therefore we do not recomme...

Страница 15: ...with a suitable sealant fireclay or high temperature silicone j Refit the burner mounting plate assembly by first putting the Receiver through the opening then tilt the assembly and slide it into the...

Страница 16: ...ng structural check may be required c The builders opening must be constructed from Non combustible materials d No combustible materials must present in the builders opening e The base of the builders...

Страница 17: ...ay in position to make a seal against the top edge of the slip at the base of the builders opening and the front face of the slips where they locate against the rear of the Fire outer frame While slid...

Страница 18: ...any rendering building work is allowed to thoroughly dry out before Installation IMPORTANT Dry lined walls ensure that any air gaps between the back of the plasterboard and wall are sealed around the...

Страница 19: ...slightly and slide it home ensuring that the sealing strips on the underside of the front riser channel and the rear of the Fire outer frame stay in position to make a seal against the base of the fi...

Страница 20: ...y Breast will occur e The Wall Mounted Television must be mounted on a suitable bracket or angled bracket that meets the Television Manufacturer s requirements and spaces the Television at least 35mm...

Страница 21: ...osition for a Wall Mounted Television Must meet the Installation Requirements of these Instructions e The Nu Flame Television Glass Heat Shield is only suitable for the Nu Flame Synergy Range of Gas F...

Страница 22: ...the Fire s Installation Instructions and the Fire Surround meets the Minimum Dimensions as detailed in the Diagrams Below b You Must take account of the Television Manufacturer s Installation requirem...

Страница 23: ...fuel tray g Place the large rear log No 1 to the rear of the fire on the fuel tray ensuring that the cut out in the log sits behind the pilot shield and that it is central about the burner h Place lo...

Страница 24: ...n the log support at the front k Place log No 5 next to log No 6 locating it on the peg and the cut out in the rear log l Place the last log No 4 so that it locates on the central peg and rests in the...

Страница 25: ...Emberglow material is a consumable material and as a limited life You can buy replacements through your local Nu Flame Ltd Stockist or Installer q For Synergy Perspective Glass Wall Mounted Installati...

Страница 26: ...m or adjacent rooms running at high The fire should continue to clear its combustion products Also operate any other flued appliance in the same or neighbouring rooms and ensure they continue to funct...

Страница 27: ...ii Now secure the upper Hinge Pin with the fixing screw provided as shown the door should then be closed and held shut by the magnet catches Very Important The Hinge Pin Screw Must be fitted to ensur...

Страница 28: ...SES WHEN LIT 20 SERVICING 20 1 GENERAL Note Servicing must be carried out by a registered installer a The fire does not have to be removed for Servicing b Check the operation and ignition of the fire...

Страница 29: ...Burner Control Assembly to Nu Flame for rectification as this could be the least cost option 21 3 PILOT GOES OUT AFTER FIRST LIGHTING a Check there is no vermiculite blocking the flame to the thermoco...

Страница 30: ...ork d Change the Handset and or Receiver and or Burner Control System Important In instances where it is indicating that either of the main control systems need changing you should investigate returni...

Страница 31: ...5 4 The fire must be Installed serviced by a properly qualified in accordance with Local National Codes Installation Engineer and in accordance with these Installation Instructions Supplier Nu Flame L...

Страница 32: ...fire must be Installed serviced by a properly qualified in accordance with Local National Codes Installation Engineer and in accordance with these Installation Instructions Supplier Nu Flame Limited...

Страница 33: ...33 23 DIAGRAM OF INFRARED CONTROL SYSTEM...

Страница 34: ...elivery to us We will not be liable for any such breakages or losses Under no circumstances should any attempt be made to repair the burner on site without our express knowledge and approval during th...

Отзывы: