NRG USER MANUAL
SymphoniePLUS3 User Guide
SymphoniePLUS3_DataLogger_Manual
Rev. 17
[email protected] | Page 63
31 December 2018
Connect the iPack Ground Wire to the Logger
If you haven’t done so already, connect the iPack’s green/yellow striped ground wire to the logger’s
ground stud. To do this, remove the nut and lock washer from the logger ground stud, place the ground
wire lug from the iPack over the logger ground stud, replace the lock washer and nut; tighten the nut.
3.
Install the PV panel (iPack users only)
Inside the PV panel carton you will find a PV panel and four screws. Remove the five plastic plugs from
the SymphoniePLUS3 shelter box door.