DRYING MATERIAL
9.1 Initial Dryer Startup
NOTE:
Assure voltage and phasing are correct, cooling water is connected
(if drying over 225°F) and pickup wand is inserted in material supply.
Turn main electrical disconnect switch to “ON” position.
Quick Op screen (below) will appear
(Main Electrical Switch
.
Press Resin Menu (See details on page 21) and choose resin from list OR press box below
PROCESS SETPOINT and enter drying temperature.
Press the OFF button for to
turn dryer and Process Heater “ON”
WARNING:
Always use
to turn dryer “ON” or “OFF”.
Repeated use of E-STOP can cause component failure.
Only use EMERGENCY STOP in True Emergency Conditions.
Check Process or Regen blower to ensure they are turning on correct direction per
arrow.
If they are not, follow instructions on page 17.
Press the Hopper Loader icon to start loading material into the hopper.
While waiting for dryer to reach temperature and achieve-40
°
dew point,
Press MENU, then DRYER SETUP then Real Time Clock.
1
6
Check and correct the pre-sets.
Press Gray button to enable changes.
Press each button where a change is
required and keypad will appear.
Make entry, then press
after each
entry. Continue until all fields are
correct. Enable Daylight Savings
Correction, if applicable.
Press “Monitor Mode - Press to
Program” to start clock.
Press
button, then Auto-Start Menu if
you want to program automatic Start/Stop
times for the dryer.
11
6
160
Process Heater
ON/OFF
Dryer ON/OFF
3
4
-40°
2