MM371W / MM372W Installation Instructions
17
TRANSFORMER OR SOLAR PANEL WIRING INSTALLATION
WARNING
Before digging contact local authorities to locate underground utilities such as electric and gas service.
Step 1
Step 2
●
Locate power outlet and identify wire
path to control box.
●
If installing a solar panel (FM123 sold
separately), see solar panel instruction
manual and skip to Step 3.
●
Note:
If your outlet is outside, use a
weatherproof cover.
●
Along the identified path between outlet and control box, dig a trench to lay the low voltage transformer wire (RB509 sold
separately).
●
Use PVC conduit from the ground up to the control box.
CAUTION: Please
call your power company
before you dig. Failure to
do so could cause injury
or even death.