18
MM371W / MM372W Installation Instructions
TRANSFORMER OR SOLAR PANEL WIRING INSTALLATION
GRN
WHT
BAT+
AUTO
CLOSE
RESET
PULL
ST
AGGER
W
ARNING
BAT–
GRN
WHT
BRN
ORG
BRN
ORG
RED
BLK
RED
BLK
COM
COM
CYCL
SAFE
EXIT
SHDW
AUX V+ AUX V-
LOCK V+ LOCK V-
CLOSE EDGE OPEN EDGE
PRIMAR
Y
SECONDAR
Y
LOCK
AUX
SW1
SW2
PUSH
1 2 3 4 5
+
TERM6
AUTO
CLOSE
RESET
PULL
ST
AGGER
W
ARNING
COM
COM
CYCL
SAFE
EXIT
SHDW CLOSE EDGE OPEN EDGE
PUSH
1 2 3 4 5
+
GRN
WHT
BAT+
BAT–
GRN
WHT
BRN
ORG
RED
BLK
SECONDAR
Y
SW1
SW2
TERM6
Operator Arm Cable/Power Access
Alternate Access
●
Feed the transformer or solar panel wires into the control box using one of the access locations on the bottom of the box.
●
Connect the RED wire to PWR+ and the BLACK wire to PWR- on TERM 6 as shown.
Step 3
Step 3B (MM372 Only)
●
Cut a 6" deep slot into the driveway to accommodate PVC conduit (not provided) for the power cable coming from the
Second opener to the control box. The buried conduit will protect the 32 foot power cable from automobile tires, lawn
mower blades, weed eaters, and grazing animals.
●
Pull the secondary operator cable through the conduit.
●
Repeat steps 1-3 above for connecting the SECONDARY operator cable to the control board.
Second gate opener
Master gate opener
Run PVC conduit
(not included)
under driveway to protect
second opener power cable and low voltage wire.