10-20
Page 71
2008-10-01
(b) Examine roughing-in for piping systems to verify actual locations of piping
connections before humidifier installation.
(c) Proceed with installation only after unsatisfactory conditions have been corrected.
(2) Installation
(a) Install humidifiers and steam dispersion panels per manufacturers’ instructions.
(b) Seal humidifier dispersion-tube duct penetrations with flange.
(c) Install with required clearance for service and maintenance.
(3) Commissioning
(a) System verification testing is part of the commissioning process. Verification
testing shall be performed by the contractor and witnessed and documented by the
commissioning authority. Refer to section 01810, Commissioning, for system
verification tests and commissioning requirements; or
(b) Manufacturer's Field Service: Engage a factory-authorized service representative
to inspect field-assembled components and equipment installation, including
piping and electrical connections. Report results in writing. Responsibilities
include:
1
Leak Test: After installation, charge system and test for leaks. Repair leaks
and retest until no leaks exist.
2
Operational Test: After electrical circuitry has been energized, start units to
confirm proper unit operation. Remove malfunctioning units, replace with new
units, and retest.
3
Test and adjust controls and safeties. Replace damaged and malfunctioning
controls and equipment.
(4) Testing
(a) System testing is accomplished through either of the following methods:
1
System verification testing is part of the commissioning process. Verification
testing shall be performed by the contractor and witnessed and documented
by the commissioning authority. Refer to section 01810, Commissioning, for
system verification tests and commissioning requirements; or
2
Manufacturer’s Field Service: Engage a factory-authorized service
representative to inspect field-assembled components and equipment
installation, including piping and electrical connections. Report results in
writing. Responsibilities include:
a
Leak Test: After installation, charge system and test for leaks. Repair
leaks and retest until no leaks exist.
b
Operational Test: After electrical circuitry has been energized, start units
to confirm proper unit operation. Remove malfunctioning units, replace
with new units, and retest.
c
Test and adjust controls and safeties. Replace damaged and
malfunctioning controls and equipment.
(5) Training
(a) Equipment training can be accomplished in one of the following two ways:
Содержание NHPC
Страница 1: ...2538144 B NH Series NHTC NHPC ELECTRODE STEAM HUMIDIFIER Engineering Manual TM ...
Страница 9: ...10 00 Page 1 2008 10 01 10 00 INTRODUCTION ...
Страница 10: ...10 00 Page 2 2008 10 01 Figure 1 NHTC ...
Страница 13: ...10 00 Page 5 2008 10 01 Figure 2 Optimum Boiling Time Figure 3 Conductivity ...
Страница 18: ...10 00 Page 10 2008 10 01 Figure 6 Typical NHRS Installation Sheet 1 of 2 ...
Страница 19: ...10 00 Page 11 2008 10 01 Figure 7 Typical NHRS Installation Sheet 2 of 2 ...
Страница 20: ...10 10 Page 12 2008 10 01 10 10 HUMIDITY STEAM ABSORPTION AND DISTRIBUTION ...
Страница 35: ...10 10 Page 27 2008 10 01 Figure 2 Psychrometric Chart ...
Страница 47: ...10 10 Page 39 2008 10 01 Figure 13 Humidification Distance Nomogram Figure 12 Cutting Duct For Mounting ...
Страница 58: ...10 10 Page 50 2008 10 01 Figure 26 Typical SAM e Installation for Atmospheric Steam Applications ...
Страница 64: ...10 10 Page 56 2008 10 01 Figure 30 NORTEC OnLine Monitoring ...
Страница 71: ...10 20 Page 63 2008 10 01 10 20 SPECIFICATIONS ...
Страница 81: ...10 30 Page 73 2008 10 01 10 30 SUBMITTALS ...
Страница 86: ...10 30 Page 78 2008 10 01 Figure 2 Primary Line Voltage Wiring to Unit ...
Страница 87: ...10 30 Page 79 2008 10 01 Figure 3 Physical Data NHTC NHPC 005 030 ...
Страница 88: ...10 30 Page 80 2008 10 01 Figure 4 Physical Data NHTC NHPC 050 100 ...
Страница 89: ...10 30 Page 81 2008 10 01 Figure 5 Physical Data NHTC NHPC 150 200 ...
Страница 95: ...10 30 Page 87 2008 10 01 Figure 11 In Duct AHU Installation Without Mounting Frame Installation ...
Страница 96: ...10 30 Page 88 2008 10 01 Figure 12 In Duct AHU Installation With Mounting Frame Installation ...
Страница 97: ...10 30 Page 89 2008 10 01 Figure 13 Outside Duct Installation Without Mounting Frame Installation ...
Страница 98: ...10 30 Page 90 2008 10 01 Figure 13 In Duct AHU Installation With Mounting Frame Installation ...
Страница 99: ...10 30 Page 91 2008 10 01 Figure 14 Vertical Duct Installation Figure 15 Outside Duct Mounting Cover Plates ...
Страница 100: ...10 30 Page 92 2008 10 01 Figure 16 Atmospheric SAM e Adapter Dimensions ...
Страница 101: ...10 30 Page 93 2008 10 01 Figure 17 Atmospheric Steam Header and Adapter Configuration ...
Страница 102: ...10 30 Page 94 2008 10 01 Figure 18 Physical Data for Remote Mounted Blower Pack ...
Страница 103: ...10 30 Page 95 2008 10 01 Figure 19 Physical Data Units with Optional Built On Blower Packs ...
Страница 104: ...10 30 Page 96 2008 10 01 Figure 20 Physical Data Units with Optional Built On Blower Packs ...