10-50
Page 9
2006-09-15
E.
PERIODIC MAINTENANCE CHECKLIST AND QUICK REFERENCE (PAGE 1 OF 2)
Unit Serial #
: _________________
No. of humidifiers:
_______
Tag:
_______________
Unit type:
___________________
Voltage:
_____V/___ph
Steam output:
____lbs/hr
Customer/Job:
______________
Address:
______________________________________
Inspected by:
________________
Date of inspection:
____/____/____
WHEN TO REPLACE THE CYLINDER:
NHTC/NHPC light indication and LCD display:
1.
Yellow and Green light with W19: Cylinder Spent indicates the cylinder must be
replaced in the next 72 hours.
2.
Red and Yellow light with E19: Cylinder Spent indicates the cylinder is at the end of
its life and must be replaced.
CYLINDER REPLACEMENT PROCEDURE:
1.
Turn off water supply to unit.
2.
Activate drain to completely empty water content (less than 10 minutes)
3.
When drained, stop drain and turn off unit.
4.
Also open the main electrical disconnect switch and open plumbing.
5.
Remove the cylinder plugs by pulling vertically. The plugs are press-fitted over the
electrode pins protruding from the top of the cylinder.
6.
Using a slotted screwdriver, loosen the steam line clamp(s) and pull steam line off
the cylinder vertically.
7.
Using a small slotted screwdriver, depress tab on the re-usable cable tie, if present,
around the middle of the cylinder. This will loosen the cable tie to come apart for re-
use later on.
8.
The cylinder is now ready to be removed from the unit.
CAUTION
: Cylinder and any remaining water might still be HOT.
9.
Always clean the drain valve before installing a new cylinder. (see further below)
10.
Remove the used cylinder and replace by a new one. Do not re-use cylinder.
MANDATORY CLEANING OF THE DRAIN VALVE
1.
Note that ring terminal for drain valve green ground wire is sandwiched between
drain valve body and drain pan.
2.
Remove two screws securing drain valve body to drain pan. Disconnect the two
slip-on terminals from the two tabs on the (24 VAC) drain valve coil.
3.
Remove hose clip and hose connection from drain valve body.
4.
Drain valve assembly is now free to be taken to a sink for disassembly and cleaning.
Importan
t: Tapered end of spring must be installed toward the solenoid.
5.
Clean out the end of the hose, and then reconnect it to the drain valve body with the
clamp.
6.
Fit mounting screws through drain valve body, one through ring terminal on green
ground wire.
WARNING
: To prevent the possibility of electrical shock the green ground wire must be
reinstalled before power is restored. Push the two slip-on terminals back onto
the two tabs on the coil. The terminals, although not identical, are reversible.
Содержание NH Series
Страница 1: ...Manual No H 101 2006 09 15 NH Series ELECTRODE STEAM HUMIDIFIER Installation Manual TM ...
Страница 9: ...10 00 Page 1 2006 09 15 10 00 INTRODUCTION ...
Страница 10: ...10 00 Page 2 2006 09 15 Figure 1 NHTC ...
Страница 14: ...10 00 Page 6 2006 09 15 Figure 6 Typical NHTC Installation Sheet 1 of 2 ...
Страница 15: ...10 00 Page 7 2006 09 15 Figure 6 Typical NHTC Installation Sheet 2 of 2 ...
Страница 16: ...10 00 Page 8 2006 09 15 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 17: ...10 10 Page 1 2006 09 15 10 10 INSTALLATION PROCEDURES ...
Страница 20: ...10 10 Page 4 2006 09 15 Figure 3 Water Drain and Supply Connection ...
Страница 22: ...10 10 Page 6 2006 09 15 Figure 4 Steam Run and Condensate Return Installation Guidelines Sheet 1 of 2 ...
Страница 23: ...10 10 Page 7 2006 09 15 Figure 4 Steam Run and Condensate Return Installation Guidelines Sheet 2 of 2 ...
Страница 41: ...10 10 Page 25 2006 09 15 Figure 24 Typical SAM e Duct Installation ...
Страница 45: ...10 10 Page 29 2006 09 15 Figure 27 Drain Water Cooler Option Installation with SAM e ...
Страница 48: ...10 10 Page 32 2006 09 15 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 49: ...10 20 Page 1 2006 09 15 10 20 OPERATION ...
Страница 54: ...10 20 Page 6 2006 09 15 Figure 6 Basic Steam Production Method ...
Страница 56: ...10 20 Page 8 2006 09 15 Figure 7 Software Flow Chart Sheet 1 of 7 ...
Страница 57: ...10 20 Page 9 2006 09 15 Figure 7 Software Flow Chart Sheet 2 of 7 ...
Страница 58: ...10 20 Page 10 2006 09 15 Figure 7 Software Flow Chart Sheet 3 of 7 ...
Страница 59: ...10 20 Page 11 2006 09 15 Figure 7 Software Flow Chart Sheet 4 of 7 ...
Страница 60: ...10 20 Page 12 2006 09 15 Figure 7 Software Flow Chart Sheet 5 of 7 ...
Страница 61: ...10 20 Page 13 2006 09 15 Figure 7 Software Flow Chart Sheet 6 of 7 ...
Страница 62: ...10 20 Page 14 2006 09 15 Figure 7 Software Flow Chart Sheet 7 of 7 ...
Страница 67: ...10 20 Page 19 2006 09 15 Figure 9 SAM e Operation Figure 10 Blower Pack Operation and Adjustments ...
Страница 72: ...10 20 Page 24 2006 09 15 Figure 14 NORTEC OnLine Status Page ...
Страница 73: ...10 30 Page 1 2006 09 15 10 30 MAINTENANCE PROCEDURES ...
Страница 79: ...10 40 Page 1 2006 09 15 10 40 TROUBLESHOOTING ...
Страница 91: ...10 50 Page 1 2006 09 15 10 50 TECHNICAL ...
Страница 95: ...10 50 Page 5 2006 09 15 Figure 4 NHTC NHPC Wiring Diagram ...
Страница 105: ...10 50 Page 15 2006 09 15 Figure 8 NHTC NHPC Electrical Compartment Exploded View and Spare Parts ...
Страница 108: ...10 50 Page 18 2006 09 15 THIS PAGE INTENTIONALLY LEFT BLANK ...