WARRANTY
(1) AXAIR NORTEC INC. and/or AXAIR NORTEC LTD. (hereinafter collectively referred to
as THE COMPANY), warrant for a period of two years after installation or 30 months
from manufacturer’s ship date, whichever date is earlier, that THE COMPANY’s
manufactured and assembled products, not otherwise expressly warranted (with the
exception of the cylinder), are free from defects in material and workmanship. No
warranty is made against corrosion, deterioration, or suitability of substituted materials
used as a result of compliance with government regulations.
(2) THE COMPANY’s obligations and liabilities under this warranty are limited to furnishing
replacement parts to the customer, F.O.B. THE COMPANY’s factory, providing the
defective part(s) is returned freight prepaid by the customer. Parts used for repairs are
warranted for the balance of the term of the warranty on the original humidifier or
90 days, whichever is longer.
(3) The warranties set forth herein are in lieu of all other warranties expressed or implied
by law. No liability whatsoever shall be attached to THE COMPANY until said products
have been paid for in full and then said liability shall be limited to the original purchase
price for the product. Any further warranty must be in writing, signed by an officer of
THE COMPANY.
(4) THE COMPANY’s limited warranty on accessories, not of the companies manufacture,
such as controls, humidistats, pumps, etc. is limited to the warranty of the original
equipment manufacturer from date of original shipment of humidifier.
(5) THE COMPANY makes no warranty and assumes no liability unless the equipment is
installed in strict accordance with a copy of the catalog and installation manual in effect
at the date of purchase and by a contractor approved by THE COMPANY to install
such equipment.
(6) THE COMPANY makes no warranty and assumes no liability whatsoever for
consequential damage or damage resulting directly from misapplication, incorrect
sizing or lack of proper maintenance of the equipment.
(7) THE COMPANY retains the right to change the design, specification and performance
criteria of its products without notice or obligation.
Содержание NH Series
Страница 1: ...Manual No H 101 2006 09 15 NH Series ELECTRODE STEAM HUMIDIFIER Installation Manual TM ...
Страница 9: ...10 00 Page 1 2006 09 15 10 00 INTRODUCTION ...
Страница 10: ...10 00 Page 2 2006 09 15 Figure 1 NHTC ...
Страница 14: ...10 00 Page 6 2006 09 15 Figure 6 Typical NHTC Installation Sheet 1 of 2 ...
Страница 15: ...10 00 Page 7 2006 09 15 Figure 6 Typical NHTC Installation Sheet 2 of 2 ...
Страница 16: ...10 00 Page 8 2006 09 15 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 17: ...10 10 Page 1 2006 09 15 10 10 INSTALLATION PROCEDURES ...
Страница 20: ...10 10 Page 4 2006 09 15 Figure 3 Water Drain and Supply Connection ...
Страница 22: ...10 10 Page 6 2006 09 15 Figure 4 Steam Run and Condensate Return Installation Guidelines Sheet 1 of 2 ...
Страница 23: ...10 10 Page 7 2006 09 15 Figure 4 Steam Run and Condensate Return Installation Guidelines Sheet 2 of 2 ...
Страница 41: ...10 10 Page 25 2006 09 15 Figure 24 Typical SAM e Duct Installation ...
Страница 45: ...10 10 Page 29 2006 09 15 Figure 27 Drain Water Cooler Option Installation with SAM e ...
Страница 48: ...10 10 Page 32 2006 09 15 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 49: ...10 20 Page 1 2006 09 15 10 20 OPERATION ...
Страница 54: ...10 20 Page 6 2006 09 15 Figure 6 Basic Steam Production Method ...
Страница 56: ...10 20 Page 8 2006 09 15 Figure 7 Software Flow Chart Sheet 1 of 7 ...
Страница 57: ...10 20 Page 9 2006 09 15 Figure 7 Software Flow Chart Sheet 2 of 7 ...
Страница 58: ...10 20 Page 10 2006 09 15 Figure 7 Software Flow Chart Sheet 3 of 7 ...
Страница 59: ...10 20 Page 11 2006 09 15 Figure 7 Software Flow Chart Sheet 4 of 7 ...
Страница 60: ...10 20 Page 12 2006 09 15 Figure 7 Software Flow Chart Sheet 5 of 7 ...
Страница 61: ...10 20 Page 13 2006 09 15 Figure 7 Software Flow Chart Sheet 6 of 7 ...
Страница 62: ...10 20 Page 14 2006 09 15 Figure 7 Software Flow Chart Sheet 7 of 7 ...
Страница 67: ...10 20 Page 19 2006 09 15 Figure 9 SAM e Operation Figure 10 Blower Pack Operation and Adjustments ...
Страница 72: ...10 20 Page 24 2006 09 15 Figure 14 NORTEC OnLine Status Page ...
Страница 73: ...10 30 Page 1 2006 09 15 10 30 MAINTENANCE PROCEDURES ...
Страница 79: ...10 40 Page 1 2006 09 15 10 40 TROUBLESHOOTING ...
Страница 91: ...10 50 Page 1 2006 09 15 10 50 TECHNICAL ...
Страница 95: ...10 50 Page 5 2006 09 15 Figure 4 NHTC NHPC Wiring Diagram ...
Страница 105: ...10 50 Page 15 2006 09 15 Figure 8 NHTC NHPC Electrical Compartment Exploded View and Spare Parts ...
Страница 108: ...10 50 Page 18 2006 09 15 THIS PAGE INTENTIONALLY LEFT BLANK ...