(h) Mount the field supplied rod to the top steam tube bracket to secure the assembly
in place. Refer to Figure 24.
(2) INSTALLATION WITH ADJUSTABLE MOUNTING FRAME (Optional, see
Figure 22)
(a) Insert the sliding panel into the base.
(b) Fasten pivoting head to the sliding panel with 0.375 in. UNC x 1 in. bolt, nut and
washer assembly (factory supplied).
(c) Mark the location of the four holes and drill four x 0.500 in. (12.7 mm) holes.
(d) Fasten side frame to base of manifold with 0.375 in. UNC x 1 in. bolt, nut and
washer assembly (factory supplied).
(e) Fasten pivoting heads to duct or air handler using bolt, nut and washer
assembly (field supplied).
C.
VERTICAL IN-DUCT INSTALLATION
NOTE
Mounting frame required. (See Figure 26.)
(1) Once you have selected the location of the manifold, use the supplied template to cut
out the holes for the steam inlet and condensate drain outlet.
(2) Rotate header mounting brackets to accommodate a minimum 10
°
angle.
Figure 26. Vertical Duct Installation
Содержание NH Series
Страница 1: ...Manual No H 101 2006 09 15 NH Series ELECTRODE STEAM HUMIDIFIER Installation Manual TM ...
Страница 9: ...10 00 Page 1 2006 09 15 10 00 INTRODUCTION ...
Страница 10: ...10 00 Page 2 2006 09 15 Figure 1 NHTC ...
Страница 14: ...10 00 Page 6 2006 09 15 Figure 6 Typical NHTC Installation Sheet 1 of 2 ...
Страница 15: ...10 00 Page 7 2006 09 15 Figure 6 Typical NHTC Installation Sheet 2 of 2 ...
Страница 16: ...10 00 Page 8 2006 09 15 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 17: ...10 10 Page 1 2006 09 15 10 10 INSTALLATION PROCEDURES ...
Страница 20: ...10 10 Page 4 2006 09 15 Figure 3 Water Drain and Supply Connection ...
Страница 22: ...10 10 Page 6 2006 09 15 Figure 4 Steam Run and Condensate Return Installation Guidelines Sheet 1 of 2 ...
Страница 23: ...10 10 Page 7 2006 09 15 Figure 4 Steam Run and Condensate Return Installation Guidelines Sheet 2 of 2 ...
Страница 41: ...10 10 Page 25 2006 09 15 Figure 24 Typical SAM e Duct Installation ...
Страница 45: ...10 10 Page 29 2006 09 15 Figure 27 Drain Water Cooler Option Installation with SAM e ...
Страница 48: ...10 10 Page 32 2006 09 15 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 49: ...10 20 Page 1 2006 09 15 10 20 OPERATION ...
Страница 54: ...10 20 Page 6 2006 09 15 Figure 6 Basic Steam Production Method ...
Страница 56: ...10 20 Page 8 2006 09 15 Figure 7 Software Flow Chart Sheet 1 of 7 ...
Страница 57: ...10 20 Page 9 2006 09 15 Figure 7 Software Flow Chart Sheet 2 of 7 ...
Страница 58: ...10 20 Page 10 2006 09 15 Figure 7 Software Flow Chart Sheet 3 of 7 ...
Страница 59: ...10 20 Page 11 2006 09 15 Figure 7 Software Flow Chart Sheet 4 of 7 ...
Страница 60: ...10 20 Page 12 2006 09 15 Figure 7 Software Flow Chart Sheet 5 of 7 ...
Страница 61: ...10 20 Page 13 2006 09 15 Figure 7 Software Flow Chart Sheet 6 of 7 ...
Страница 62: ...10 20 Page 14 2006 09 15 Figure 7 Software Flow Chart Sheet 7 of 7 ...
Страница 67: ...10 20 Page 19 2006 09 15 Figure 9 SAM e Operation Figure 10 Blower Pack Operation and Adjustments ...
Страница 72: ...10 20 Page 24 2006 09 15 Figure 14 NORTEC OnLine Status Page ...
Страница 73: ...10 30 Page 1 2006 09 15 10 30 MAINTENANCE PROCEDURES ...
Страница 79: ...10 40 Page 1 2006 09 15 10 40 TROUBLESHOOTING ...
Страница 91: ...10 50 Page 1 2006 09 15 10 50 TECHNICAL ...
Страница 95: ...10 50 Page 5 2006 09 15 Figure 4 NHTC NHPC Wiring Diagram ...
Страница 105: ...10 50 Page 15 2006 09 15 Figure 8 NHTC NHPC Electrical Compartment Exploded View and Spare Parts ...
Страница 108: ...10 50 Page 18 2006 09 15 THIS PAGE INTENTIONALLY LEFT BLANK ...