10-20
Page 2
2006-09-15
OPERATION
1. NHTC
A.
NHTC COMPONENTS
(1) Refer to Figures 1 and 2 when reading Table 1.
B.
HUMIDIFIER START-UP
(1) Figure 3 describes the method for powering up a humidifier and the cautions to take.
C.
BASIC STEAM PRODUCTION METHOD
(1) Figure 6 describes the method the NH Series humidifier uses to produce pure clean
steam. The NORTEC NH electrode steam humidifier uses NORTEC’s patented Auto-
Adaptive cycle to calculate drains to maintain optimal performance. Figure 4 Drain Rate
vs Water Conductivity depicts an indication of drain amounts.
D.
CYLINDER LIFE
(1) The output of all NH Series humidifiers is pure, clean steam; minerals originally in the
incoming water are left behind. These minerals will eventually coat the cylinder
electrodes. Therefore, the mineral content of the incoming water, the unit running time
and output capacity setting ultimately determine cylinder life. NORTEC’s cylinder life is
up to 2,000 hours of operation. Water chemistry and capacity can affect cylinder life.
(See Figure 5.) See Table 4 to identify the message which indicates when the cylinder
is at the end of its life.
Figure 1. NHTC Components (Front View)
Figure 2. NHTC Components (Side View)
Содержание NH Series
Страница 1: ...Manual No H 101 2006 09 15 NH Series ELECTRODE STEAM HUMIDIFIER Installation Manual TM ...
Страница 9: ...10 00 Page 1 2006 09 15 10 00 INTRODUCTION ...
Страница 10: ...10 00 Page 2 2006 09 15 Figure 1 NHTC ...
Страница 14: ...10 00 Page 6 2006 09 15 Figure 6 Typical NHTC Installation Sheet 1 of 2 ...
Страница 15: ...10 00 Page 7 2006 09 15 Figure 6 Typical NHTC Installation Sheet 2 of 2 ...
Страница 16: ...10 00 Page 8 2006 09 15 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 17: ...10 10 Page 1 2006 09 15 10 10 INSTALLATION PROCEDURES ...
Страница 20: ...10 10 Page 4 2006 09 15 Figure 3 Water Drain and Supply Connection ...
Страница 22: ...10 10 Page 6 2006 09 15 Figure 4 Steam Run and Condensate Return Installation Guidelines Sheet 1 of 2 ...
Страница 23: ...10 10 Page 7 2006 09 15 Figure 4 Steam Run and Condensate Return Installation Guidelines Sheet 2 of 2 ...
Страница 41: ...10 10 Page 25 2006 09 15 Figure 24 Typical SAM e Duct Installation ...
Страница 45: ...10 10 Page 29 2006 09 15 Figure 27 Drain Water Cooler Option Installation with SAM e ...
Страница 48: ...10 10 Page 32 2006 09 15 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 49: ...10 20 Page 1 2006 09 15 10 20 OPERATION ...
Страница 54: ...10 20 Page 6 2006 09 15 Figure 6 Basic Steam Production Method ...
Страница 56: ...10 20 Page 8 2006 09 15 Figure 7 Software Flow Chart Sheet 1 of 7 ...
Страница 57: ...10 20 Page 9 2006 09 15 Figure 7 Software Flow Chart Sheet 2 of 7 ...
Страница 58: ...10 20 Page 10 2006 09 15 Figure 7 Software Flow Chart Sheet 3 of 7 ...
Страница 59: ...10 20 Page 11 2006 09 15 Figure 7 Software Flow Chart Sheet 4 of 7 ...
Страница 60: ...10 20 Page 12 2006 09 15 Figure 7 Software Flow Chart Sheet 5 of 7 ...
Страница 61: ...10 20 Page 13 2006 09 15 Figure 7 Software Flow Chart Sheet 6 of 7 ...
Страница 62: ...10 20 Page 14 2006 09 15 Figure 7 Software Flow Chart Sheet 7 of 7 ...
Страница 67: ...10 20 Page 19 2006 09 15 Figure 9 SAM e Operation Figure 10 Blower Pack Operation and Adjustments ...
Страница 72: ...10 20 Page 24 2006 09 15 Figure 14 NORTEC OnLine Status Page ...
Страница 73: ...10 30 Page 1 2006 09 15 10 30 MAINTENANCE PROCEDURES ...
Страница 79: ...10 40 Page 1 2006 09 15 10 40 TROUBLESHOOTING ...
Страница 91: ...10 50 Page 1 2006 09 15 10 50 TECHNICAL ...
Страница 95: ...10 50 Page 5 2006 09 15 Figure 4 NHTC NHPC Wiring Diagram ...
Страница 105: ...10 50 Page 15 2006 09 15 Figure 8 NHTC NHPC Electrical Compartment Exploded View and Spare Parts ...
Страница 108: ...10 50 Page 18 2006 09 15 THIS PAGE INTENTIONALLY LEFT BLANK ...