10-20
Page 7
2006-09-15
E.
SOFTWARE INITIAL SELF-TEST
Table 2. Self-Test Messages
F.
SOFTWARE FLOW CHART WITH DEFINITIONS
(1) The flow chart in Figure 7 depicts the software logic and definitions.
G. SELF-HELP
(1) The microcomputer applies corrective actions whenever its self-diagnostics identifies a
problem that it is able to correct by itself. If the corrective action is not successful then
it displays a system message. If the corrective action requires a service person, then
the microcomputer’s only resort is to stop the unit and display a system message. The
unit never stops unless it has to.
(2) After three days of no call from either the on/off controls or the modulating controls,
when active, the three-day drain active feature is automatically activated long enough
to drain all water from the steam cylinder. This NORTEC feature will prolong the life of
the cylinder. (User selectable, default is ON.)
Graphic Display
Explanation/Comments (What You Read)
NHTC START-UP:
INIT CYLINDER
The unit is beginning its bootup routine, along with powering up the EEPROM on the
SMART Cylinder
NHTC START-UP:
READING CYLINDER DATA
The unit reads the type of cylinder to provide maximum control of operation. If it
unable to do so it will skip the rest of the self-test and fault out.
SELF TEST CYLINDER
Inlet Valve
ESC
Unit energizes the fill valve for 1 second.
SELF TEST CYLINDER
Drain Valve
ESC
Unit energizes the drain valve for 2 seconds.
SELF TEST CYLINDER
Heat Cont.
ESC
Unit closes the contactor for 2 seconds.
SELF TEST CYLINDER
Pump
ESC
Unit activates the pump (if present) for 2 seconds.
SELF TEST CYLINDER
Bleed Valve
ESC
Unit activates the bleed valve (if present) for 2 seconds.
SELF TEST REMOTE
Steam Relay
ESC
Unit activates the steam relay for remote fault indication package and green light.
SELF TEST REMOTE
Service Relay
ESC
Unit activates the service relay for remote fault indication package and yellow light.
SELF TEST REMOTE
Error Relay
ESC
Unit activates the error relay for remote fault indication package and red light.
SELF TEST REMOTE
Oper. Relay
ESC
Unit activates the unit on relay.
Содержание NH Series
Страница 1: ...Manual No H 101 2006 09 15 NH Series ELECTRODE STEAM HUMIDIFIER Installation Manual TM ...
Страница 9: ...10 00 Page 1 2006 09 15 10 00 INTRODUCTION ...
Страница 10: ...10 00 Page 2 2006 09 15 Figure 1 NHTC ...
Страница 14: ...10 00 Page 6 2006 09 15 Figure 6 Typical NHTC Installation Sheet 1 of 2 ...
Страница 15: ...10 00 Page 7 2006 09 15 Figure 6 Typical NHTC Installation Sheet 2 of 2 ...
Страница 16: ...10 00 Page 8 2006 09 15 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 17: ...10 10 Page 1 2006 09 15 10 10 INSTALLATION PROCEDURES ...
Страница 20: ...10 10 Page 4 2006 09 15 Figure 3 Water Drain and Supply Connection ...
Страница 22: ...10 10 Page 6 2006 09 15 Figure 4 Steam Run and Condensate Return Installation Guidelines Sheet 1 of 2 ...
Страница 23: ...10 10 Page 7 2006 09 15 Figure 4 Steam Run and Condensate Return Installation Guidelines Sheet 2 of 2 ...
Страница 41: ...10 10 Page 25 2006 09 15 Figure 24 Typical SAM e Duct Installation ...
Страница 45: ...10 10 Page 29 2006 09 15 Figure 27 Drain Water Cooler Option Installation with SAM e ...
Страница 48: ...10 10 Page 32 2006 09 15 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 49: ...10 20 Page 1 2006 09 15 10 20 OPERATION ...
Страница 54: ...10 20 Page 6 2006 09 15 Figure 6 Basic Steam Production Method ...
Страница 56: ...10 20 Page 8 2006 09 15 Figure 7 Software Flow Chart Sheet 1 of 7 ...
Страница 57: ...10 20 Page 9 2006 09 15 Figure 7 Software Flow Chart Sheet 2 of 7 ...
Страница 58: ...10 20 Page 10 2006 09 15 Figure 7 Software Flow Chart Sheet 3 of 7 ...
Страница 59: ...10 20 Page 11 2006 09 15 Figure 7 Software Flow Chart Sheet 4 of 7 ...
Страница 60: ...10 20 Page 12 2006 09 15 Figure 7 Software Flow Chart Sheet 5 of 7 ...
Страница 61: ...10 20 Page 13 2006 09 15 Figure 7 Software Flow Chart Sheet 6 of 7 ...
Страница 62: ...10 20 Page 14 2006 09 15 Figure 7 Software Flow Chart Sheet 7 of 7 ...
Страница 67: ...10 20 Page 19 2006 09 15 Figure 9 SAM e Operation Figure 10 Blower Pack Operation and Adjustments ...
Страница 72: ...10 20 Page 24 2006 09 15 Figure 14 NORTEC OnLine Status Page ...
Страница 73: ...10 30 Page 1 2006 09 15 10 30 MAINTENANCE PROCEDURES ...
Страница 79: ...10 40 Page 1 2006 09 15 10 40 TROUBLESHOOTING ...
Страница 91: ...10 50 Page 1 2006 09 15 10 50 TECHNICAL ...
Страница 95: ...10 50 Page 5 2006 09 15 Figure 4 NHTC NHPC Wiring Diagram ...
Страница 105: ...10 50 Page 15 2006 09 15 Figure 8 NHTC NHPC Electrical Compartment Exploded View and Spare Parts ...
Страница 108: ...10 50 Page 18 2006 09 15 THIS PAGE INTENTIONALLY LEFT BLANK ...