2. CHECK LISTS
A.
PRE-NORTEC ONLINE START UP CHECKLIST WIRING
(1) Humidifier-to-Humidifier
Connection:
G
Each individual Humidifier linked
to lead Unit.
G
Connection can be direct or
daisy-chained to other units.
(2) Network Connection:
G
Lead Unit wired to Local Network
(Ethernet, GPRS, Dial-up).
G
Network activity verified.
(3) Controls Wired:
G
Directly to humidifiers.
(4) Start-Up Procedure:
G
Ensure power is being supplied
to the humidifier and Nortec
Online Module.
G
Verify power to NetBiter (Power
LED should be lit).
G
After power-up, verify network
communication.
G
Verify variable operation after
mapping is complete.
G
Perform regular humidifier
start-up check.
B.
PRE-NORTEC LINKS START-UP CHECKLIST
(1) Humidifier-to-Humidifier
Connection:
G
Each individual Humidifier linked
to lead Unit.
G
Connection can be direct or
daisy-chained to other units.
(2) Network Connection:
G
Lead Unit wired to Local BMS.
G
Network activity verified.
(3) Controls Wired:
G
Directly to humidifiers.
(4) Start-Up Procedure:
G
Verify power to NORTEC Links
module.
G
Verify power to I/O-Controller.
G
Adjust Network address dials to
desired address (BACnet/IP
address is preset at factory).
G
After power-up, verify network
communication.
G
Map desired network variables to
BMS.
G
Verify variable operation after
mapping is complete.
G
Perform regular humidifier start-
up check.
Содержание NH Series
Страница 1: ...Manual No H 101 2006 09 15 NH Series ELECTRODE STEAM HUMIDIFIER Installation Manual TM ...
Страница 9: ...10 00 Page 1 2006 09 15 10 00 INTRODUCTION ...
Страница 10: ...10 00 Page 2 2006 09 15 Figure 1 NHTC ...
Страница 14: ...10 00 Page 6 2006 09 15 Figure 6 Typical NHTC Installation Sheet 1 of 2 ...
Страница 15: ...10 00 Page 7 2006 09 15 Figure 6 Typical NHTC Installation Sheet 2 of 2 ...
Страница 16: ...10 00 Page 8 2006 09 15 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 17: ...10 10 Page 1 2006 09 15 10 10 INSTALLATION PROCEDURES ...
Страница 20: ...10 10 Page 4 2006 09 15 Figure 3 Water Drain and Supply Connection ...
Страница 22: ...10 10 Page 6 2006 09 15 Figure 4 Steam Run and Condensate Return Installation Guidelines Sheet 1 of 2 ...
Страница 23: ...10 10 Page 7 2006 09 15 Figure 4 Steam Run and Condensate Return Installation Guidelines Sheet 2 of 2 ...
Страница 41: ...10 10 Page 25 2006 09 15 Figure 24 Typical SAM e Duct Installation ...
Страница 45: ...10 10 Page 29 2006 09 15 Figure 27 Drain Water Cooler Option Installation with SAM e ...
Страница 48: ...10 10 Page 32 2006 09 15 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 49: ...10 20 Page 1 2006 09 15 10 20 OPERATION ...
Страница 54: ...10 20 Page 6 2006 09 15 Figure 6 Basic Steam Production Method ...
Страница 56: ...10 20 Page 8 2006 09 15 Figure 7 Software Flow Chart Sheet 1 of 7 ...
Страница 57: ...10 20 Page 9 2006 09 15 Figure 7 Software Flow Chart Sheet 2 of 7 ...
Страница 58: ...10 20 Page 10 2006 09 15 Figure 7 Software Flow Chart Sheet 3 of 7 ...
Страница 59: ...10 20 Page 11 2006 09 15 Figure 7 Software Flow Chart Sheet 4 of 7 ...
Страница 60: ...10 20 Page 12 2006 09 15 Figure 7 Software Flow Chart Sheet 5 of 7 ...
Страница 61: ...10 20 Page 13 2006 09 15 Figure 7 Software Flow Chart Sheet 6 of 7 ...
Страница 62: ...10 20 Page 14 2006 09 15 Figure 7 Software Flow Chart Sheet 7 of 7 ...
Страница 67: ...10 20 Page 19 2006 09 15 Figure 9 SAM e Operation Figure 10 Blower Pack Operation and Adjustments ...
Страница 72: ...10 20 Page 24 2006 09 15 Figure 14 NORTEC OnLine Status Page ...
Страница 73: ...10 30 Page 1 2006 09 15 10 30 MAINTENANCE PROCEDURES ...
Страница 79: ...10 40 Page 1 2006 09 15 10 40 TROUBLESHOOTING ...
Страница 91: ...10 50 Page 1 2006 09 15 10 50 TECHNICAL ...
Страница 95: ...10 50 Page 5 2006 09 15 Figure 4 NHTC NHPC Wiring Diagram ...
Страница 105: ...10 50 Page 15 2006 09 15 Figure 8 NHTC NHPC Electrical Compartment Exploded View and Spare Parts ...
Страница 108: ...10 50 Page 18 2006 09 15 THIS PAGE INTENTIONALLY LEFT BLANK ...