10-10
Page 8
2006-09-15
Table 4. Recommended Condensate Line at Distributor(s)
Table 5. Equivalent Length Elbow and T-Fittings
Table 6. Humidifier and Distributor Inlet/Outlet Sizes
Dispersion Method
Condensate Hose
Copper Tube
Stainless Steel Tube
1 x Steam Distributor
0.375 in.
NORTEC 132-8840
0.250 in. MED-L Tubing
(0.375 in. OD)
0.375 in. Tube 0.049 in.
thick.
3 x Steam Distributor*
0.375 in.
NORTEC 132-8840
0.500 in. MED-L Tubing
(0.875 in. OD)
0.650 in. Tube 0.049 in.
thick
NOTE:
*When using more than one distributor, the condensate line must be trapped before it is joined together. See
Figure 4.
Nominal Tube Diameter
Standard 90 Degree Elbow
Standard 45 Degree Elbow
Side Outlet Tee
0.750/ 0.875 in.
2 ft
1 ft
4 ft
1.500/1.750 in.
3 ft 6 in.
1 ft 9 in.
7 ft
2.000/2.500 in.
4 ft 6 in.
2 ft 3 in.
10 ft
Humidifier
Steam Outlet
Distributor
Steam Inlet
NH 5-30
0.875 in. OD
ASD, BSD
0.875 in.OD
NH 50-100
1.75 in. OD
CSD
0.875 in. OD
NH 150-200
TWO 1.75 in.OD
BLOWER PACK
1.75 in.OD
SAM-e
1.75 in. OD*
mini SAM-e
0.875 or 1.75 in. OD**
NOTE:
*
SAM-e may have multiple 1.75 in. inlets depending on order.
**Mini SAM-e inlet is determined on order and may have two 1.75 in. OD inlets.
Содержание NH Series
Страница 1: ...Manual No H 101 2006 09 15 NH Series ELECTRODE STEAM HUMIDIFIER Installation Manual TM ...
Страница 9: ...10 00 Page 1 2006 09 15 10 00 INTRODUCTION ...
Страница 10: ...10 00 Page 2 2006 09 15 Figure 1 NHTC ...
Страница 14: ...10 00 Page 6 2006 09 15 Figure 6 Typical NHTC Installation Sheet 1 of 2 ...
Страница 15: ...10 00 Page 7 2006 09 15 Figure 6 Typical NHTC Installation Sheet 2 of 2 ...
Страница 16: ...10 00 Page 8 2006 09 15 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 17: ...10 10 Page 1 2006 09 15 10 10 INSTALLATION PROCEDURES ...
Страница 20: ...10 10 Page 4 2006 09 15 Figure 3 Water Drain and Supply Connection ...
Страница 22: ...10 10 Page 6 2006 09 15 Figure 4 Steam Run and Condensate Return Installation Guidelines Sheet 1 of 2 ...
Страница 23: ...10 10 Page 7 2006 09 15 Figure 4 Steam Run and Condensate Return Installation Guidelines Sheet 2 of 2 ...
Страница 41: ...10 10 Page 25 2006 09 15 Figure 24 Typical SAM e Duct Installation ...
Страница 45: ...10 10 Page 29 2006 09 15 Figure 27 Drain Water Cooler Option Installation with SAM e ...
Страница 48: ...10 10 Page 32 2006 09 15 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 49: ...10 20 Page 1 2006 09 15 10 20 OPERATION ...
Страница 54: ...10 20 Page 6 2006 09 15 Figure 6 Basic Steam Production Method ...
Страница 56: ...10 20 Page 8 2006 09 15 Figure 7 Software Flow Chart Sheet 1 of 7 ...
Страница 57: ...10 20 Page 9 2006 09 15 Figure 7 Software Flow Chart Sheet 2 of 7 ...
Страница 58: ...10 20 Page 10 2006 09 15 Figure 7 Software Flow Chart Sheet 3 of 7 ...
Страница 59: ...10 20 Page 11 2006 09 15 Figure 7 Software Flow Chart Sheet 4 of 7 ...
Страница 60: ...10 20 Page 12 2006 09 15 Figure 7 Software Flow Chart Sheet 5 of 7 ...
Страница 61: ...10 20 Page 13 2006 09 15 Figure 7 Software Flow Chart Sheet 6 of 7 ...
Страница 62: ...10 20 Page 14 2006 09 15 Figure 7 Software Flow Chart Sheet 7 of 7 ...
Страница 67: ...10 20 Page 19 2006 09 15 Figure 9 SAM e Operation Figure 10 Blower Pack Operation and Adjustments ...
Страница 72: ...10 20 Page 24 2006 09 15 Figure 14 NORTEC OnLine Status Page ...
Страница 73: ...10 30 Page 1 2006 09 15 10 30 MAINTENANCE PROCEDURES ...
Страница 79: ...10 40 Page 1 2006 09 15 10 40 TROUBLESHOOTING ...
Страница 91: ...10 50 Page 1 2006 09 15 10 50 TECHNICAL ...
Страница 95: ...10 50 Page 5 2006 09 15 Figure 4 NHTC NHPC Wiring Diagram ...
Страница 105: ...10 50 Page 15 2006 09 15 Figure 8 NHTC NHPC Electrical Compartment Exploded View and Spare Parts ...
Страница 108: ...10 50 Page 18 2006 09 15 THIS PAGE INTENTIONALLY LEFT BLANK ...