Introduction |
2
Receiving and Unpacking
1
Check packing slip to ensure ALL material has been delivered.
2
All material shortages are to be reported to Nortec within 48 hours from receipt of goods.
Nortec assumes no responsibility for any material shortages beyond this period.
3
Inspect shipping boxes for damage and note damages on shipping waybill accordingly.
4
After unpacking, inspect equipment for damage and if damage is found, notify the shipper
promptly.
5
All Nortec products are shipped on an FOB factory basis. Any and all damage, breakage or
loss claims are to be made directly to the shipping company.
Before Installation
1
Ensure that available voltage and phase corresponds with humidifier voltage and phase as
indicated on humidifier’s specification label.
2
Ensure that the dedicated fused disconnect provided for the humidifier is of sufficient size to
handle the rated amps as indicated on the specification label.
3
Ensure sufficient clearances will be available as described in “Location” on page 13.
4
Ensure steam lines can be routed to distributor as described in Steam Lines and
Condensate Returns on page 16.
Figure 1: Specification Label Location
Содержание MES2
Страница 41: ...Maintenance and Servicing 38 ...
Страница 49: ...Spare Parts 46 Exploded View and Spare Parts List ...
Страница 50: ...47 Spare Parts MES2 Spare Parts Figure 28 MES2 Spare Parts 1 10 9 7 2 11 13 5 14 15 3 4 6 17 12 8 16 ...
Страница 52: ...49 Warranty ...