
23
| Operation
Operation
24 User Interface
24 LED Status Lights
24 On/Off Drain Switch
25 Humidifier Configuration
26 Capacity Adjustment
26 Mains Voltage Select (J1 to J6)
26 High Water Sensor Voltage (J8 and J9)
26 On/Off or Modulating Control (J10)
26 Modulation Offset (J13)
27 Ground Fault Interrupt (GFI) (J15)
27 Modbus Control (J26)
27 Modbus Configuration
27 Modbus Addresses
30 Start Up Procedure
Содержание MES2
Страница 41: ...Maintenance and Servicing 38 ...
Страница 49: ...Spare Parts 46 Exploded View and Spare Parts List ...
Страница 50: ...47 Spare Parts MES2 Spare Parts Figure 28 MES2 Spare Parts 1 10 9 7 2 11 13 5 14 15 3 4 6 17 12 8 16 ...
Страница 52: ...49 Warranty ...