31
4.8
C
OMPLETING THE
I
NSTALLATION
1.
Start up your sprayer and test the
sprayer’s functionality. The NORAC
Control Panel does not need to be
powered up for the original switches to
function. Unfold the booms and
raise/lower each boom and main
section.
Again confirm that the
cabling/hoses are agreeable to
the entire range of motion.
2.
If any functions do not work, review the
hydraulic and electrical portions of this
manual to check for proper installation.
If you still have trouble, contact
NORAC for assistance.
3.
Turn on the power for the UC4+
Control Panel using the switch on the
side of its chassis.
4.
Repeat the Boom Speed Test as
described in Section
4.2
Boom Speed
Test
with the NORAC UC4+ Spray
Height Control system installed.
Record the results for comparison in
Table 6
.
5.
The procedure for the installation of the
UC4+ Spray Height Control system is
now complete. Begin the AUTOMATIC
SYSTEM SETUP procedure as described
in the
UC4+ Sprayer Boom Control
Operator’s Manual
(
M01
).
Содержание UC4 Plus Rogator 64 Series
Страница 10: ...8 Figure 3 Hydraulic Plumbing Schematic ...
Страница 25: ...23 Figure 26 Load Sense Plumbing on some JD4710 Rear of Sprayer Front view of block H06 F03 ...
Страница 26: ...24 Figure 27 Load Sense Line Connection to John Deere Combination Valve Block H06 F03 Rear of Sprayer ...
Страница 27: ...25 Figure 28 2003 Load Sense Line Connection H06 F03 ...
Страница 35: ...33 5 3 ITEM C02B 44664 CABLE UC4 CAN NODE DUAL ...
Страница 36: ...34 5 4 ITEM C03 44656D CABLE VALVE VARIABLE RATE DT ...
Страница 37: ...35 5 5 ITEM C04 44651 CABLE VALVE EXTENSION ...
Страница 38: ...36 5 6 ITEM C10 44650 14 CABLE UC4 POWER BOOM CONTROL JOHN DEERE ...
Страница 39: ...37 5 7 ITEM C12 44658 01 CABLE UC4 VALVE BC JD ...
Страница 41: ...39 Figure 37 Cable C12 44658 01 BEFORE Modification ...
Страница 42: ...40 Figure 38 Cable C12 44658 01 AFTER Modification ...