Install the 2-pin connectors from
C03
onto each NORAC valve as shown in
Figure 35
.
13.
The connectors on the valve cable
(
C03
) are marked
RIGHT UP
,
LEFT
UP
,
RIGHT DOWN
and
LEFT
DOWN
. Cables labeled with
UP
go
on the same side as the hydraulic hoses.
Figure 35: Valve Cable Connections
14.
Connect the CAN Node cable (
C02B
)
to the 4-pin AMP plug on
C01
15.
Route
C02B
to the roll sensors which
are installed in
Section 4.5
. Follow
existing cables and/or hydraulic lines.
16.
Connect the sensor branch cable (
C02
)
to the 4-pin AMP plug on
C02B
(
Figure 36
).
17.
Route
C02
to the wing and main
sensors and connect to the sensors.
Follow existing cables and/or hydraulic
lines along the boom.
Route the main lift cable through
the main lift mounting bracket
tube to provide additional cable
protection
18.
Cable-tie the installed cables every 12
inches.
IMPORTANT:
Provide enough slack in all cables to
account for the movement of the
main section, parallel lift, and
FOLDING boom movement.
Figure 36: Cable Configurations: C01,
C02 and C02B
Содержание UC4 Plus Rogator 64 Series
Страница 10: ...8 Figure 3 Hydraulic Plumbing Schematic ...
Страница 25: ...23 Figure 26 Load Sense Plumbing on some JD4710 Rear of Sprayer Front view of block H06 F03 ...
Страница 26: ...24 Figure 27 Load Sense Line Connection to John Deere Combination Valve Block H06 F03 Rear of Sprayer ...
Страница 27: ...25 Figure 28 2003 Load Sense Line Connection H06 F03 ...
Страница 35: ...33 5 3 ITEM C02B 44664 CABLE UC4 CAN NODE DUAL ...
Страница 36: ...34 5 4 ITEM C03 44656D CABLE VALVE VARIABLE RATE DT ...
Страница 37: ...35 5 5 ITEM C04 44651 CABLE VALVE EXTENSION ...
Страница 38: ...36 5 6 ITEM C10 44650 14 CABLE UC4 POWER BOOM CONTROL JOHN DEERE ...
Страница 39: ...37 5 7 ITEM C12 44658 01 CABLE UC4 VALVE BC JD ...
Страница 41: ...39 Figure 37 Cable C12 44658 01 BEFORE Modification ...
Страница 42: ...40 Figure 38 Cable C12 44658 01 AFTER Modification ...