Technical Instructions for
Correlation Sensors
Page 6
Correlation Sensors – Rev. 07 as of 20.04.2016
®
Personnel requirements
Installation, commissioning and maintenance shall be executed only by person-
nel meeting the demands as follows:
-
Expert personnel with relevant training an appropriate qualification
-
Personnel authorised by the plant operator
Qualified personnel
within the context of this documentation or the safety notes on the product
itself are persons who are sufficiently familiar with installation, mounting, start-
ing up and operation of the product and who have the relevant qualifications
for their work; for example.
-
Training, instruction or authorisation to activate/deactivate, isolate, ground,
and mark electric circuits and devices/systems according to the safety en-
gineering standards.
-
Education and instruction according to the standards of safety engineering
regarding the maintenance and use of adequate safety equipment.
-
First aid training
Applicable documentation
For the installation and operation of the complete system extra instruction man-
uals or technical descriptions may be required apart from this manual.
-
Instruction manual for the flow measurement unit NivuFlow 750
-
Technical Instructions for iXT or MPX
-
Installation Instruction for correlation and Doppler sensors
These manuals are provided with the auxiliary units or sensors.