Operation and Maintenance Manual
Second Edition
24
Maxiton GTJZ
Fundamentals
It is the responsibility of the Niuli Machiner to perform
delivery prepare.
The inspection is designed to discover before deliver
the machine.
If damage or any unauthorized variation from factory
delivered condition is discovered, the machine must
be tagged and removed from service.
Scheduled maintenance inspections shall be
completed by qualified service technicians,
according to the manufacturer's specifications and
the requirements specified in the responsibilities
manual.
Enchiridion
Use the operator manual when operate the machine.
Delivery prepare contain Pre-operation Inspection,
Maintenance Procedures, Function Tests.
Use the following chart to note result.
Place a check in the appropriate box after each
inspection procedure is completed.
If any inspection receives an “N”, tag and remove the
machine from service, repair and re-inspect it. After
repair, place a check in the “R” box.
Legend
Y = yes, acceptable
N = no, remove from service
R = repaired
Procedure
Y
N
R
Pre-operation
Inspection
Maintenance
Procedures
Function Tests