Operation and Maintenance Manual
Second Edition
19
Maxiton GTJZ
Electrocution hazard. Contact
with electrically charged circuits could result in death or
serious injury. Remove all rings, watches and other
jewelry.
1-2 Extensions
platform
1 On the platform level
2 Remove the shaft on both sides in the roller,remove
the roller.
3 Removed extensions platform.
1-3
Platform Guardrail
1 On the platform level
2 Remove the guardrail and respectively chassis
connected pin shaft,put up good.
3 In turn off the fence respectively
Boom Components 2-1
How to Remove the Boom
When remove hose and tube fittings,must remove hose
or at the end of the pipe joints of the O-rings.
In the arm in position when the
plane contract execution of the process.
1 Remove after work platform
2 Remove arm wearing and the axis of joint
chassis,remove the slider.
3 Remove and lifting cylinder pipe and connect the
join,move the pipe joints,and all the wires.
4 Arms frame in the whole discharge level
5 Dismantling the lifting oil cylinder,then moved away
6 From up to down in each arm between frame
removed connecting shaft,according to the order put
them in order.
7 Remove the arm of the frame on the last shock the
slider.
Chassis parts 3-1 Drive Pump
Drive pump is a long working power unit.The output of
the pump by the pump the points on the displacement
control.
How to Remove the Drive Pumps
1 Disconnect the electric drive pump in the
displacement controller circuit connection.
2 Shut down two at hydraulic oil tank on the hydraulic
oil tank globe valve.
3 From the drive pump mark, disconnect and fort
hydraulic hose.
4 With proper support equipment support drive pump
and remove two drive pump installation bolt.
5 Be careful to pull out until the pump shaft drive pump
spline from flexible coupling.
6 Move up the drive pump from the machine.
3-2 Hydraulic oil tank
How to Remove the Hydraulic oil
tank
1 Open at the side of the hydraulic oil tank