13
C. INSTALLATION OF THE UNIT
SEE DETAIL A
ST-A1291-29-00
COVER SOULD BE
FIRMLY SECURED IN TABS
ON BASEPAN BEFORE
APPLYING SCREWS.
DETAIL A
ST-A1291-30-00
DETAIL A
COVER SOULD BE
FIRMLY SECURED IN TABS
ON BASEPAN BEFORE
APPLYING SCREWS.
SEE DETAIL A
Figure C.3.5. – A: Downflow to Horizontal Conversion
C.3.5. Cover Panel Installation/Conversion Procedure
SECURE COVER(S) WITH
SCREWS ALONG THE
FRONT AND SIDE FLANGES
SEE DETAIL VIEW
SUPPLY OR
RETURN COVER
INSULATION
BASERAILS
SIDE
PANELS
ST-A1291-31-00
BASEPAN
SUPPLY OR
RETURN COVER
BASEPAN
DETAIL VIEW
INSIDE EDGE OF COVER
FITS UNDER FASTING TAB
FROM DOWNFLOW TO HORIZONTAL
1. Remove the covers from the supply and return openings on the unit.
See Figure B.3.6. – B
for reference.
2. Install the covers over the supply and return openings in the basepan, painted side up, inserting the leading flange under the
bracket provided. Place the back flange to top of the front bracket provided.
See Figure C.3.5. –A
for reference.
3. Secure the return and supply cover to front bracket with screws.
Содержание Climate Master RGED Series
Страница 2: ...2 62 ...
Страница 88: ...88 P APPENDICES Appendix C Air Flow Performance Data ...
Страница 90: ...90 P APPENDICES Appendix C Air Flow Performance Data Cont ...
Страница 92: ...92 P APPENDICES Appendix C Air Flow Performance Data Cont ...
Страница 94: ...94 P APPENDICES Appendix C Air Flow Performance Data Cont ...
Страница 159: ...159 ...