D. DUCT AND VENTING
D.2.1. Supply Duct Systems
A properly designed supply duct system,
meeting all local codes and best practices,
must be installed to ensure proper air flow and
minimize the static pressure on the blower.
The supply duct opening for roof curb
installations is 28 3/4” x 14 1/4”, the supply duct
opening for horizontal ducted installations is
28 3/8” x 13 7/8”.
See Figure B.3.6. – A and B
for reference.
D.2.2. Return Duct Systems
A properly designed return duct system,
meeting all local codes and best practices,
must be installed to ensure proper air flow and
minimize the static pressure on the blower.
The return duct opening for roof curb
installations is 36 5/8” x 12 7/8”, the return duct
opening for horizontal ducted installations is 36
3/8” x 12 5/8”.
See Figure B.3.6. – A and – B
for reference
D.2.3. Isolation for Noise abatement
Noise from operational vibration can occur with
this equipment, the use of flexible duct adapters
and vibration damping curb adapters maybe
required depending upon the building type and
use. Consult with a local mechanical engineer
on the duct and building design to determine
if any noise abatement solutions need to be
considered before installation.
ST-A1273-61-00
TO CHANGE AIR FILTERS
REMOVE PANEL IN THIS AREA
FILTERS
D.3. Filters
D.3.1. Installing Filters
Содержание Climate Master RGED Series
Страница 2: ...2 62 ...
Страница 88: ...88 P APPENDICES Appendix C Air Flow Performance Data ...
Страница 90: ...90 P APPENDICES Appendix C Air Flow Performance Data Cont ...
Страница 92: ...92 P APPENDICES Appendix C Air Flow Performance Data Cont ...
Страница 94: ...94 P APPENDICES Appendix C Air Flow Performance Data Cont ...
Страница 159: ...159 ...