18
C. INSTALLATION OF THE UNIT
C.4.3. On a Roof Curb
Refer to
Figure C.3.1. - A
in section
C.3.1. “Unit Location: Allowable Clearances and Operational
Issues”
before installing the unit on a roof curb.
Only use manufacturer-approved roofcurb products for the unit.
C.4.3.1. Installing the Roof Curb
Refer to the separate Installation Instructions for installing a roof curb. These instructions are listed
under these Manufacturer Part numbers:
• 14” and 21” Roofcurb: 92-107192-07
• Roofcurb Adapter: 92-107192-09
C.4.3.2. Setting the Unit
Figure C.4.3.2. - A: Setting the unit on Roofcurb Assembly
C.4.3.3. High Wind and Seismic Tie-Down Methods
The units must be secured in compliance with ASCE 7-10 and the Florida Building Code 5th Edition.
Please refer to
Appendix J: Unit Tie-Down Methods
.
C.4.4. On a slab
C.4.4.1. Setting the Unit
Set the unit on a stable concrete pad with adequate clearances around the sides of the unit, and
make sure the unit is level before securing.
Before setting/securing the unit, use this opportunity to convert the unit from a downflow
configuration to a sideflow configuration if necessary. Refer to section
C.3.5. Cover Panel
Installation/Conversion Procedure
.
C.4.4.2. High Wind and Seismic Tie-Down Methods
Slab-installed units must also be secured in compliance with ASCE 7-10 and the Florida Building
Code 5th Edition. Please refer to
Appendix J: Unit Tie-Down Methods
.
Содержание Climate Master RGED Series
Страница 2: ...2 62 ...
Страница 88: ...88 P APPENDICES Appendix C Air Flow Performance Data ...
Страница 90: ...90 P APPENDICES Appendix C Air Flow Performance Data Cont ...
Страница 92: ...92 P APPENDICES Appendix C Air Flow Performance Data Cont ...
Страница 94: ...94 P APPENDICES Appendix C Air Flow Performance Data Cont ...
Страница 159: ...159 ...