HK 200S
HK 200S-6
Connection between HK 200S-6 / HK 200S
and AMS 10
The conductor connecting the devices must be con-
nected to the power supply clamp (TB) at AMS 10
and to clamp (X2) at HK 200S-6 / HK 200S.
Connect the phase (brown), neutral conductor (blue),
communication (black and grey) i protective (yellow-
green) according to the drawing:
Connect the phase (brown), neutral conductor (blue),
communication (black and grey) i protective (yellow-
green) according to the drawing:
IMPORTANT
The AMS 10 module is to be grounded before connect-
ing the devices with a cable. The cabling must be fixed
in such a way so that the terminal block is not under
tension. The terminal without insulation is 8 mm long.
AMS 10-6 / AMS 10-8
AMS 10-12
HK 200S-6
2
3
L
N
PE
AMS 10-6
TB
X2
L
N
1
2
3
Connections between HK 200S-6 / HK 200S
and SMO 20/40
SMO 20/40 must be connected to HK 200S-6 / HK 200S
with the 3-wire cable minimum 1,5 mm
2
cross section.
Connect the circulation pump (GP12) to clamps X4:5
(PE), X4:6 (N) and X4:7 (230 V) at the top board
(AA2), according to the drawing.
Power supply connection
Connecting the circulation pump
Chapter 5 |
Electrical connections
5 x 2,5 mm
2
5 x 2,5 mm
2
HK 200S-6
HK 200S
HK 200S-6
HK 200S
HK 200S-6
HK 200S
HK 200S-6
HK 200S