PARTS:
• • 4 x M8 40mm Bolts
• • 4 x M8 Washers
PARTS:
• • Cable Management Clips
PARTS:
• • 4 x M8 40mm Bolts
• • 4 x M8 Washers
10
11
01b
Slide 8 x T-Nuts into the outside channel of the Right Base.
Video Instruction: bit.ly/nlrbuild
10
11
FRONT
REAR
IMPORTANT:
Place T-Nuts as shown in diagram below on the
OUTSIDE
of the Right Base.
(Red dots are T-Nuts placement)
LEFT
RIGHT
REAR
FRONT
04
Align the threaded holes on the Front and Rear Base Members with the pre-drilled holes on the Left
Base Member. Bolt through and secure with 4 x M8 Bolts and Washers.
03
Suggested 1 x Cable Management Clip installation into the Rear or Front Base Member.
02
Align the threaded holes on the Front and Rear Base Members with the pre-drilled holes on the Right
Base Member. Bolt through and secure with 4 x M8 Bolts and Washers.
FRONT
REAR
RIGHT
Note:
Slide 2 x
T-Nuts to front for
Pedal Support
Note:
Slide 4 x
T-Nuts to middle for
Wheel Post
Note:
Slide 2 x
T-Nuts to rear for
Seat Sliders
Note:
For easier installation hand
screw M8 bolt in to T-Nut to assist
sliding T-Nut into channel.
Note:
Depress locater tab on back
side of clip to install into channel.
LEFT
REAR
RIGHT