PARTS:
• • 8 x T-Nuts
• • Right and Left Pedal Arms
PARTS:
• • 2 x M8 60mm Bolts
• • 2 x M8 Washers
• • 2 x M8 Flange Nuts
• • 2 x Square Washers
PARTS:
• • 2 x T-Nuts
• • Right and Left Pedal Arms
PARTS:
• • 2 x M8 20mm Bolts
• • 2 x M8 Washers
PARTS:
• • 4 x M8 16mm Bolts
• • 4 x M8 Washers
• • 1 x Large Pedal Plate
PARTS:
• • 2 x M8 16mm Bolts
• • 2 x M8 Washers
• • 1 x Small Pedal Plate
18
A) Align the Small Pedal Plate with the T-Nuts previously installed in
Step 13
.
B) Bolt through and secure using M8 Bolts and Washers.
15
Install 1 x T-Nut into the outside channel of each Pedal Arms.
13
Install 3 x T-Nuts into the top channel and 1 x T-Nut into the outside channel of both the Left Pedal Arm
and the Right Pedal Arm.
17
A) Align the Large Pedal Plate with the T-Nuts previously installed in
Step 13
.
B) Bolt through and secure with M8 Bolts and Washers.
14
Align the through holes on the Pedal Arms with the holes on the Wheel Post Connection Plates. Bolt
through and secure with 2 x M8 Bolts, Washers, Square Washers and Flange Nuts.
16
Align the hole on the Wheel Post Connection Plate with the T-Nuts previously installed in
Step 15
. Bolt
through and secure with M8 Bolt and Washer. Repeat on the other side.
Video Instruction: bit.ly/nlrbuild
14
15
(
PRE-DRILLED HOLE
)
(
PRE-DRILLED HOLE
)
(
PRE-DRILLED HOLE
)
(
PRE-DRILLED HOLE
)
(
LEFT
)
(
RIGHT
)
Note:
For Shorter Users Please Skip
to STEPS 15 & 16.
ALTERNATE PEDAL INSTALLATION
(
FOR SHORTER USERS
)
(
LEFT
)
(
RIGHT
)
ALTERNATE PEDAL INSTALLATION
(
FOR SHORTER USERS
)
Repeat
on Other
Side
Note:
Do not tighten the
Pedal Plate until you achieve
the desired position.
Repeat
on Other
Side
A
)
B
)
Note:
Use laser lines for
easy alignment.
Repeat
on Other
Side
A
)
B
)
OUTSIDE VIEW
TOP VIEW
Repeat
on Other
Side