BC160 B0ILER LIMITED WARRANTY
Subject to the following conditions Newmac Manufacturing Inc. warrants the appliance, to the original owner purchaser, under normal use and repair, against defects in workmanship and
materials for a period of one calendar year from the date of original installation. This limited warranty does not cover nozzles, filters, etc. that may be contaminated at time of installation.
The burner, controls or any other electrical or mechanical components not manufactured by Newmac are warranted for a period of one year from date of original installation by their
respective manufacturers; most burners have 3 years.
On the date of original installation Newmac warrants for a period of ten (10) years to the original purchaser that the pressure vessel will be free from defects in material and workmanship
provided however, this limited warranty shall apply only to the original installation in a single dwelling unit used without interruption by the purchaser as his or her principal residence. This
limited warranty is subject to the conditions and exceptions of warranty listed below.
Under the above limited warranty Newmac Mfg. at its option will repair or replace the pressure vessel under the above terms or offer the then current applicable retail price of a pressure
vessel towards a new equivalent BOILER. Proof of original purchase will be required.
The limited warranty must be registered within 30 days of installation or the following pro-rated warranty “Ten-Year Warranty” applies.
Where the owner of the dwelling is not the original purchaser and in multi-family dwellings Newmac warrants the pressure vessel against defects in materials and workmanship under a 10
year Limited Warranty subject to the conditions and exceptions listed below and on a prorated basis as follows of the then current retail price
Owner
Owner
Warranty
Replacement
Protection
Charge
First full year
100%
0%
From year one through year two
80%
20%
From year two through year four
60%
40%
From year four through year six
50%
50%
From year six through year eight
40%
60%
From year eight through year ten
20%
80%
From year ten and over
0%
100%
The purchaser must pay all other costs of warranty service including labor costs involving diagnostic calls and/or removing, servicing and/or replacing warranty parts and/or warehousing
charges and/or freight costs. All parts are supplied F.O.B. Debert, Nova Scotia and the defective parts must be returned freight prepaid for repair and/or warranty consideration when requested
by Newmac Mfg.
CONDITIONS
This BOILER must be installed with a Dumping Zone.
This limited warranty refers to the Pressure Vessel only. In order for this limited warranty to be effective:
1. The BOILER must be installed by a qualified licensed installer and in accordance with Newmac’s installation instructions. The BOILER must also be installed in accordance with all
applicable, local states, or provincial codes and the INSTITUTE of BOILER and RADIATIOR MFG. or generally accepted equivalent standards.
2. The BOILER must operate in an environment not contaminated by halogens (such as, but not limited to, fluorine or chlorine) or chlorinated hydrocarbons. These corrosive chemicals
entering the combustion area cause rapid deterioration of inner surfaces leading to heat exchanger failures. The BOILER must be maintained and cleaned on an annual basis by qualified
personnel. Oil filters and nozzles must be changed annually.
3. The BOILER must be sized and fired correctly as stated on the label for the residence. The label must not have been defaced or removed.
4. The BOILER must not be modified from its published design or purpose.
5. The BOILER must not have been removed from the original installation site.
6. The BOILER must be installed with an Air Separator.
7. The BOILER must have corrosion inhibitor in the water.
8. The BOILER must be grounded.
9. The BOILER must be installed on a closed system.
10. Warranty on the boiler, when used with a Floor Radiant Heat System will only be valid if tubing with complete OXYGEN BARRIER is used.
11.There must be adequate combustion air installed to the BOILER room; and in the case of sidewall venting there must be adequate ventilation air in addition to combustion air to prevent
depressurization of the home.
12.Warranty components may be replaced with reconditioned parts at the discretion of Newmac Mfg.
13.Proof of original purchase will be requested under this warranty.
14.Proof of failure must be supplied in writing within (30) days of failure.
EXCEPTIONS
1. All labor, freight or diagnostic calls, removal and replacement costs and warehousing charges are the responsibility of the purchaser including the return to Debert, Nova Scotia of defective
parts.
2. Defects or damages caused by failure of the refractory chamber, improper installation, wiring, electrical current characteristics, accident, misuse or abuse, fire, flood, alteration and or
misapplication of the product, default or delay in performance; caused by war, government restrictions, restraints, strikes, material or freezing.
3. Refractory chamber, nozzles, etc.
4. Defects or damages caused by nozzle failure and/or plugging and/or oil flow restrictions due to cold oil from outside tanks or misalignment of burner at installation.
5. This limited warranty, in no way, can be considered as a guarantee of workmanship of an installer connected with the installation of the Newmac Oil Fired BOILER, or as imposing on
Newmac any liability of any nature for unsatisfactory performance as a result of faulty workmanship in the installation which liability is expressly disclaimed.
6. This limited warranty will not be applicable if the BOILER is damaged or a result of being improperly serviced or operated.
7. Defects or Corrosion due to excess oxygen or electrolysis.
LIMITATIONS ON WARRANTY
Newmac will make no express warranties other than the warranty set forth above. All implied warranties including the implied warranties of a merchantability and fitness for a particular
purpose are limited to the duration of the express warranty, set forth above. Liability for incidental and consequential damages are excluded regardless of the cause. Some provinces in Canada
and some states in the U.S.A. do not allow limitations on how long an implied warranty lasts so the above may not apply to you. The expressed warranties made in this warranty are exclusive
and may not be altered, enlarged or changed by any distributor, dealer or any other person whatsoever. All replacement parts whether new or remanufactured, assume as their warranty period
on the remaining period of this warranty. For routine service requirements contact the dealer who installed the equipment originally, or an alternate qualified and registered heating dealer or
electrician.
LIMITED WARRANTY REGISTRATION
PLEASE PRINT OR TYPE:
Owner’s Name………………………………………………………………………………………………………………………….……
Address of Installation……………………………………………………………………………………………………………….……….
Date of Installation…………………………………………………………………………………………………………………………...
Dealer’s Name……………………………………………………………………………………………………………………………….
Dealer’s Address……………………………………………………………………………………………………………………………..
Boiler Serial No……………………………………………………….Boiler Model No……………………………………………………
Newmac Mfg. Inc., P.O. Box 9, Lancaster Cr., Debert, NS B0M 1G0
Содержание BC 160
Страница 21: ...20 DIAGRAM 4 SECONDARY AIR OPENINGS LOW WATER CUT OFF FITTING...
Страница 23: ...22 DIAGRAM 6 GENERAL ASSEMBLY...
Страница 24: ...23 Diagram 7 FLUE PIPE CONNECTION Diagram 8 MINIMUM INSTALLATION CLEARANCES...
Страница 25: ...24 Diagram 9 CONTROL PANEL...
Страница 26: ...25 Diagram 10A FIELD WIRING...
Страница 27: ...26 Diagram 10B FIELD WIRING WITH LOW WATER CUT OFF...
Страница 28: ...27 Diagram 11...
Страница 29: ...28 Diagram 13A...
Страница 30: ...29 Diagram 13B...
Страница 31: ...30 Diagram 14 WOOD ADD ON WIRING...
Страница 32: ...31 Diagram 15A...
Страница 33: ...32 Diagram 15B...
Страница 34: ...33 Diagram 16A TYPICAL PIPING ZONING WITH CIRCULATORS...
Страница 35: ...34 Diagram 16B TYPICAL PIPING ZONING WITH ZONE VALVES...
Страница 36: ...35 Diagram 17 Diagram 18...
Страница 37: ...36 Diagram 19 Diagram 20...
Страница 38: ...37 Diagram 21 SHAKER GRATE INSTALLATION PROCEDURE...
Страница 39: ...38 Diagram 22 GRATE INSTALLATION PROCEDURE Diagram 23 CASTING INSTALLATION...
Страница 41: ...40 Diagram 24 SECONDARY AIR SYSTEM GENERAL ASSEMBLY...
Страница 42: ...41 Diagram 25 SECONDARY AIR SYSTEM INSTALLATION...