3.
Remove the two mounting screws holding the control box (4) to the heat transfer tube assembly (5).
4.
Using a suitable soft brush or cloth carefully clean any soot from the surface of the thermodisc sensor
and the inside of the heat transfer tube assembly (5).
6.
Replace the control box (4) and secure with its mounting screws.
7.
Check that the wiring is in good condition and secure.
8.
Check that the heat transfer tube assembly (5) is sealed against the oil chamber assembly by
tightening the 4 metal screws (7).
9.
Replace the cover (2) and tighten the mounting screws (1).
10. Check the operation of the WMO-1 switch as described above.
Cleaning procedure - See Figure 1B
1.
Switch off the electrical power to the appliance.
2.
Remove the WMO-1 cover (2).
3.
Remove the two mounting screws for the thermodisc temperature sensor (3).
4.
Carefully pull the sensor to one side.
5.
Using a suitable soft brush or cloth carefully clean any soot from the surface of the sensor and the
inside of the heat transfer tube.
6.
Replace the sensor and secure with its mounting screws.
7.
Check that the wiring is in good condition and secure.
8.
Check that the heat transfer tube and its securing nuts are tight.
9.
Replace the cover and tighten the mounting screws (1).
10. Check the operation of the WMO-1 switch as described above.
Troubleshooting
If for any reason the WMO-1 switch shuts the appliance down during operation, the cause of the shut
down should be investigated and corrected before resetting the switch and restarting the appliance. The
blockage switch is reset by pushing the square red button until it clicks.
Fig. 1A
Fig. 1B
Содержание BC 160
Страница 21: ...20 DIAGRAM 4 SECONDARY AIR OPENINGS LOW WATER CUT OFF FITTING...
Страница 23: ...22 DIAGRAM 6 GENERAL ASSEMBLY...
Страница 24: ...23 Diagram 7 FLUE PIPE CONNECTION Diagram 8 MINIMUM INSTALLATION CLEARANCES...
Страница 25: ...24 Diagram 9 CONTROL PANEL...
Страница 26: ...25 Diagram 10A FIELD WIRING...
Страница 27: ...26 Diagram 10B FIELD WIRING WITH LOW WATER CUT OFF...
Страница 28: ...27 Diagram 11...
Страница 29: ...28 Diagram 13A...
Страница 30: ...29 Diagram 13B...
Страница 31: ...30 Diagram 14 WOOD ADD ON WIRING...
Страница 32: ...31 Diagram 15A...
Страница 33: ...32 Diagram 15B...
Страница 34: ...33 Diagram 16A TYPICAL PIPING ZONING WITH CIRCULATORS...
Страница 35: ...34 Diagram 16B TYPICAL PIPING ZONING WITH ZONE VALVES...
Страница 36: ...35 Diagram 17 Diagram 18...
Страница 37: ...36 Diagram 19 Diagram 20...
Страница 38: ...37 Diagram 21 SHAKER GRATE INSTALLATION PROCEDURE...
Страница 39: ...38 Diagram 22 GRATE INSTALLATION PROCEDURE Diagram 23 CASTING INSTALLATION...
Страница 41: ...40 Diagram 24 SECONDARY AIR SYSTEM GENERAL ASSEMBLY...
Страница 42: ...41 Diagram 25 SECONDARY AIR SYSTEM INSTALLATION...