![Newmac BC 160 Скачать руководство пользователя страница 3](http://html1.mh-extra.com/html/newmac/bc-160/bc-160_installation-operating-and-service-manual_1679761003.webp)
2
BOILER IDENTIFICATION
BC – Boiler, Wood – Coal or Pellets
O-95,-115,-140,-155,-170 following the letters designates the approximate output of the unit in 1,000’s of
B.T.U.’s on the oil section.
Model
Oil Burner
BTUH
Output
BTUH
Input
Nozzle
(Monarch)
Pump
p.s.i.
Insertion
inches
0 – 95
F-AFC-2-8
99,000 118,490 0.85 (80ºR)
100
5-3/8”
0 – 115
F-AFC-2-8
115,000 139,400 1.00 (80ºR)
100
5-3/8”
0 – 140
F-AFC-3-8
143,000 174,250 1.25 (80ºR)
100
5-3/8”
0 – 155
F-AFC-3-8
154,000 188,190 1.35 (80ºR)
100
5-3/8”
0 - 160
F-AFC-3-8
170,000 209,000 1.50 (80°R)
100
5-3/8”
0 - 170
F-AFC-3-8
170,000 209,100 1.50 (80ºR)
100
5-3/8”
Model
Oil Burner
BTUH
Output
BTUH
Input
Nozzle
(Delevan)
Pump
p.s.i.
Insertion
inches
Air
Shutter
Setting
Air
Band
Setting
Design
Gross
Stack F°
0 – 95 AFG-AF81YYHSSS
98,000 118,490 0.85 (70ºA)
100
5-3/8”
3.0
0.5
325
0 – 115 AFG-AF81YYHSSS 115,000 139,400 1.00 (70ºA)
100
5-3/8”
3.5
0.5
375
0 – 140 AFG-AF81YYHSSS 141,000 174,250 1.25 (70ºA)
100
5-3/8”
4.5
0.5
450
0 – 155 AFG-AF81YYHSSS 152,000 188,190 1.35 (70ºA)
100
5-3/8”
5.5
0.5
475
0 - 160 AFG-AF81YYHSSS 168,000 209,000 1.50 (70ºA )
100
5-3/8”
8.0
0.5
530
0 - 170 AFG-AF81YYHSSS 168,000 209,100 1.50 (70ºA)
100
5-3/8”
8.0
0.5
530
Model
Oil Burner
BTUH
Output
BTUH
Input
Nozzle
(Delevan)
Pump
p.s.i.
Insertion
inches
Turbulator
Setting
Air
Damper
Setting
Design
Gross
Stack F°
0 – 95
40 F5
99,000 118,490 0.75 (60ºW)
145
5-3/8”
0.5
2.5
325
0 – 115
40 F5
116,000 139,400 0.85 (60ºW)
145
5-3/8”
1.0
1.8
425
40 F5
126,000 153,340 1.00 (60ºW)
145
5-3/8”
2.0
2.1
460
0 – 140
40 F5
141,000 174,250 1.10 (60ºW)
145
5-3/8”
2.5
2.6
510
0 – 155
40 F5
154,000 188,190 1.10 (60ºW)
150
5-3/8”
2.5
2.6
510
0 - 160
40 F5
170,000 209,000 1.25 (60ºW)
145
5-3/8”
3.0
2.7
540
0 - 170
40 F5
170,000 209,100 1.25 (60ºW)
145
5-3/8”
3.0
2.7
540
Beckett Low Firing Rate Baffle (3708) not used.
Designation BC-160 was adopted for the oil side of combination oil and solid fuel models with a rated
output of at least 160,000 BTU.
Use air settings as a guide only. Set burner air to give a trace of smoke. Re-adjust burner air to CO
2
reading by 1 to 1.5 %.
Take measurements with the burner cover and air duct installed (if any).
See burner manufacturer’s instructions for more information. If settings differ, use those on the appliance
label.
Riello burner insertion is measured without the burner flange gasket installed.
Beckett and Aero burner insertion is measured with the burner flange gasket installed.
Oil not heavier than #2 furnace oil.
Close oil burner supply valve if unit is to be shut down for a prolonged period of time.
If the unit is installed in an enclosed area (boiler room), ventilation must be provided for the burner –
minimum of one square inch for every 1,000 B.T.U.
MINIMUM CLEARANCE FROM COMBUSTIBLE SURFACES
BC - 160
BCO SERIES
ONE SIDE
6 inches
ONE SIDE
6 inches
OTHER SIDE
24 inches
OTHER SIDE (oil burner)
24 inches
FRONT
48 inches
FRONT
48 inches
REAR
32 inches
REAR
24 inches
FLUE
18 inches
FLUE
18 inches
FLOOR
Non combustible
FLOOR
Non combustible
Содержание BC 160
Страница 21: ...20 DIAGRAM 4 SECONDARY AIR OPENINGS LOW WATER CUT OFF FITTING...
Страница 23: ...22 DIAGRAM 6 GENERAL ASSEMBLY...
Страница 24: ...23 Diagram 7 FLUE PIPE CONNECTION Diagram 8 MINIMUM INSTALLATION CLEARANCES...
Страница 25: ...24 Diagram 9 CONTROL PANEL...
Страница 26: ...25 Diagram 10A FIELD WIRING...
Страница 27: ...26 Diagram 10B FIELD WIRING WITH LOW WATER CUT OFF...
Страница 28: ...27 Diagram 11...
Страница 29: ...28 Diagram 13A...
Страница 30: ...29 Diagram 13B...
Страница 31: ...30 Diagram 14 WOOD ADD ON WIRING...
Страница 32: ...31 Diagram 15A...
Страница 33: ...32 Diagram 15B...
Страница 34: ...33 Diagram 16A TYPICAL PIPING ZONING WITH CIRCULATORS...
Страница 35: ...34 Diagram 16B TYPICAL PIPING ZONING WITH ZONE VALVES...
Страница 36: ...35 Diagram 17 Diagram 18...
Страница 37: ...36 Diagram 19 Diagram 20...
Страница 38: ...37 Diagram 21 SHAKER GRATE INSTALLATION PROCEDURE...
Страница 39: ...38 Diagram 22 GRATE INSTALLATION PROCEDURE Diagram 23 CASTING INSTALLATION...
Страница 41: ...40 Diagram 24 SECONDARY AIR SYSTEM GENERAL ASSEMBLY...
Страница 42: ...41 Diagram 25 SECONDARY AIR SYSTEM INSTALLATION...