![Newmac BC 160 Скачать руководство пользователя страница 15](http://html1.mh-extra.com/html/newmac/bc-160/bc-160_installation-operating-and-service-manual_1679761015.webp)
14
Diagram #1
BOILER INSTALLATION ON NON-COMBUSTIBLE FLOOR
In order for unit to operate at peak efficiency, seal
between boiler and ashpit with a material such as
refractory cement
Note: In order to increase firebox capacity for
burning wood, do not use the grates.
Place 5 pcs 2 ½” x 4 ½” x 9” in back of ashpit.
To form firebrick floor in base of ashpit, use the
following brick and push back against full brick in
back of ashpit.
15 pcs – 1 ¼” x 4 ½” x 9”
Line the sides of the ashpit with firebrick as shown.
Place brick at front and slide to back using:
14 pcs – 1 ¼” x 4 ½” x 9”
Содержание BC 160
Страница 21: ...20 DIAGRAM 4 SECONDARY AIR OPENINGS LOW WATER CUT OFF FITTING...
Страница 23: ...22 DIAGRAM 6 GENERAL ASSEMBLY...
Страница 24: ...23 Diagram 7 FLUE PIPE CONNECTION Diagram 8 MINIMUM INSTALLATION CLEARANCES...
Страница 25: ...24 Diagram 9 CONTROL PANEL...
Страница 26: ...25 Diagram 10A FIELD WIRING...
Страница 27: ...26 Diagram 10B FIELD WIRING WITH LOW WATER CUT OFF...
Страница 28: ...27 Diagram 11...
Страница 29: ...28 Diagram 13A...
Страница 30: ...29 Diagram 13B...
Страница 31: ...30 Diagram 14 WOOD ADD ON WIRING...
Страница 32: ...31 Diagram 15A...
Страница 33: ...32 Diagram 15B...
Страница 34: ...33 Diagram 16A TYPICAL PIPING ZONING WITH CIRCULATORS...
Страница 35: ...34 Diagram 16B TYPICAL PIPING ZONING WITH ZONE VALVES...
Страница 36: ...35 Diagram 17 Diagram 18...
Страница 37: ...36 Diagram 19 Diagram 20...
Страница 38: ...37 Diagram 21 SHAKER GRATE INSTALLATION PROCEDURE...
Страница 39: ...38 Diagram 22 GRATE INSTALLATION PROCEDURE Diagram 23 CASTING INSTALLATION...
Страница 41: ...40 Diagram 24 SECONDARY AIR SYSTEM GENERAL ASSEMBLY...
Страница 42: ...41 Diagram 25 SECONDARY AIR SYSTEM INSTALLATION...