
27-November-13 Phone: 1.800.325.7867 Fax: 1.636.925.0029 www.newcocoffee.com
3
Section 1 – Installation Instructions and Warranty Policy
Section 2 – Set-Up Programming Instructions
Section 3 – Service Level Programming Instructions
Section 1
Installation Instructions:
Place Machine on a Level Countertop Surface
Connect ¼ Inch Flare water Supply to the Water Inlet located on lower Left Rear of the Machine.
(NEWCO recommends copper tubing for use as water supply to all of our brewing equipment)
Turn water Supply On
Plug or wire brewer to the appropriate voltage circuit as indicated on the
serial tag
.
Locate power switch on the upper right rear of the machine and turn machine power on.
You are now ready to proceed to Set-Up Programming.