background image

 

12 

 

 

 

 

 

 

 

 

H

H

o

o

w

w

 

 

t

t

o

o

 

 

r

r

e

e

m

m

o

o

v

v

e

e

 

 

a

a

n

n

d

d

 

 

i

i

n

n

s

s

t

t

a

a

l

l

l

l

 

 

a

a

 

 

d

d

i

i

e

e

 

 

b

b

l

l

o

o

c

c

k

k

 

 

Following is t

he procedure to remove and install a die block. 

Note

: Be sure to turn off the power and unplug the power plug from the outlet before attempting repairs. 

TOOLS NEEDED

Phillips screwdriver. 

               

 

6 mm L shape hexagonal wrench (

Allen wrench) located in the accessory bag. 

 
  1. Remove the right and left side 4pcs screw 

  of top cover 

  of main unit. 

  2. Please pull it up and remove the top cover 

  and put it aside as the following picture. 

 

  It is better not to remove the top cover’s connector of the main body. 

  3. Remove the die block fixing screw 

  with the enclosed 

Allen wrench. 

  4. Slowly

 pull on the die block and remove it. 

 

When the shaft pin 

 is disengaged from the arm 

 of the mai

n body the di

e block punching part will go down. 

  5. Disconnect the 2 positions of the connector 

 of the depth gauge switch 

  6. Pull the shaft pin   

    out of the die block. 

  7. Prepare the new die block 

 for replacement. 

  8 . Insert the shaft pin

 

 into the new die block. 

  9. Place the die block 

 

on the die base 

  and connect the depth gauge switch 

 

firmly. 

  10. Pull up the shaft pin 

, insert it into the arm, push the die block 

  all the way in. 

 

 The groove on the back of the die block is inserted into the stud bolt

 

 

on the main body side. 

  11. Attach the die block with the screw 

  and 

firmly tighten

  12. Insert the top cover

 

 into the body from the upward direction. 

 

 Please push the connector downward so that the connector will not protrude. 

  13. Tighten the top cover screws firmly. 

  14. The die block replacement is now completed. 

 

Содержание 112-605

Страница 1: ...TRIC PERFORATORS Models 112 905 112 905L 112 605 112 705 Final 04 18 2018 Die Block Pin Type Lever Type MODEL 112 905 112 905L 905 905L Die Block 605 705 MODEL 112 605 112 705 Specifications may chang...

Страница 2: ...aution 3 Appearance 4 Part names and accessories 4 5 Operating parts and descriptions 5 6 How to operate the die block 6 7 Specifications 7 8 Operating methods 8 9 Perforating operation 9 10 Depth adj...

Страница 3: ...ic shock 2 DON T disassemble or modify the power cord otherwise injury or electrical shock may occur 3 If any abnormal state such as excessive heat smoke or a bad smell occurs IMMEDIATELY switch the m...

Страница 4: ...ait until perforation cycle is completed DON T disassemble or modify the unit as it might cause a machine malfunction possible injury fire or electric shock etc DON T perforate materials other than pa...

Страница 5: ...achine has stopped Fuse box Turns off the power when an excessive electric load is applied to the product Waste Drawer Drawer for paper chip storage Must check and empty it frequently It is advisable...

Страница 6: ...or installing the die block Alignment hole for die block It is the screw hole for aligning the die block Depth gauge Screw for adjusting the perforation depth Connector for main body cover Connector t...

Страница 7: ...e base plate will be damaged Take out the pin turn the wheel check the wheel pin is inserted surely Choose the letter insert the pin LEVER TYPE This is a lever type die block Move the lever up or down...

Страница 8: ...eedles 1 0 mm or 1 4 mm Perforation Examples Perforating Ability 30 sheets Dependent upon voltage paper weight needle diameter needle configuration 5 30 sheets Dependent upon voltage paper weight need...

Страница 9: ...e the needles to bend and the wheel to possibly sustain damage 6 Die Block No 905L Lever Type To change the number or character of the wheel rotate the levers on the wheel up or down to the number or...

Страница 10: ...a at ti io on n f fo or r u us se e L Le ev ve er r S St ty yl le e 9 90 05 5L L 1 Insert the power plug into the AC outlet 2 Select the date or number that you wish to perforate Move the lever pin up...

Страница 11: ...e right side continuous use Please refer to the above pictures Lamp lights green the machine can perforate 2 When inserting the paper into the feed opening the edge of the paper will activate the dept...

Страница 12: ...the depth Do not attempt to adjust the depth switch gauge on the left side of the die block if the power is on 1 To adjust the depth position please loosen the screw and change the depth position by...

Страница 13: ...l on the die block and remove it When the shaft pin is disengaged from the arm of the main body the die block punching part will go down 5 Disconnect the 2 positions of the connector of the depth gaug...

Страница 14: ...f the depth switch 6 7 Remove the shaft pin 8 Place the die block on the die The groove on the back and insert it into the base and connect the depth of the die block is inserted new die block gauge s...

Страница 15: ...eedles or the die plate b The needles are bent or the needles are damaged Contact your local authorized servicing dealer c Pin Style the selector pins were not inserted securely Lever Style the lever...

Страница 16: ...ull 2 If you would like to clean the top cover or the bottom cover of the perforator please wipe it with dry cloth Caution Never use solvents such as alcohol or thinner Lubricating Points Periodically...

Отзывы: