13
【
1
】
Remove the 4 screws of top cover (left and right side).
【
2
】
Lift up the top cover and put it aside
Note
: please don’t remove the bottom screws.
as picture. (Don’t remove the top
cover from connectors).
【
3
】
Remove the fixing screw of die block.
【
4
】
Pull the die block
【
5
】
Remove the connector
out partially.
of the depth switch.
【
6
】
【
7
】
Remove the shaft pin
【
8
】
Place the die block on the die
※
The groove on the back
and insert it into the
base and connect the depth
of the die block is inserted
new die block.
gauge switch firmly.
into the
stud bolt
on the
main body side.
【
11
】
【
12
】
Cover the top cover into the body
from the upward direction.
【
9
】
Pull up the shaft pin ,
【
10
】
tighten the die block
Tighten the 4 screws.
insert it into the arm,
screw
f
irmly
.
push the die block all the
way in.
※
Please push the connector
downward