CHAPTER 4
MAINTENANCE
4.1 GENERAL
Preventive maintenance is performed to keep equipment in proper working condition.
When periodically performed, it will result in longer life for the equipment and reduce
time lost due to equipment failure.
4.2 CONSOLE
CLEANING
At least once a month, clean all metal parts of unit. Use a damp cloth moistened with
water or mild detergent. If a detergent is used, remove all excess by clean water
washing.
4.3 PERIODIC
INSPECTION
At three month intervals perform the following checks and inspections with all
switches
"OFF" and incoming power disconnected.
1.
Check the fuse(s) for clean contact.
2.
Check all controls and accessible items (switches, knobs, fuse holders, screws,
nuts and bolts) to make sure they are properly tightened. Tighten any item
which
is
loose.
3.
Check that all controls are free of dust and operate easily.
4.4
VESSEL AND TUBING CLEANING
After each run clean the vessel, headplate and associated parts.
4.5
PROBE MAINTENANCE AND STORAGE
Carefully read the instruction manual of probes before use.
4.6
THE AGITATOR BEARING HOUSING (Fig. 25)
Every 3-6 months, the ball bearings and the shaft seals in the bearing housing should
be
checked and cleaned. Replace the worn out bearings and shaft seals.
M1226-0050 17
Содержание BIOFLO III
Страница 2: ......
Страница 7: ......
Страница 9: ...M1226 0050 2...
Страница 37: ...M1226 0050 30...
Страница 40: ...M1226 0050 33...
Страница 48: ...FIGURE 1 VESSEL SCHEMATIC M1226 0050 41...
Страница 49: ...FIGURE 2 SAMPLING SYSTEM M1226 0050 42...
Страница 50: ...FIGURE 3 FLOWMETER CONVERSION M1226 0050 43...
Страница 51: ...FIGURE 4 FRONT PANEL M1226 0050 44...
Страница 52: ...FIGURE 5 REAR OF CABINET M1226 0050 45...
Страница 53: ...FIGURE 6 SWITCH PANEL M1226 0050 46...
Страница 54: ...FIGURE 7 EXTERNAL NUTRIENT PUMP TERMINAL M1226 0050 47...
Страница 55: ...FIGURE 8 SUGGESTED IMPELLER LOCATION M1226 0050 48...
Страница 56: ...FIGURE 9 HEADPLATE M1226 0050 49...
Страница 57: ...FIGURE 10 SPARGER TUBE M1226 0050 50...
Страница 58: ...FIGURE 11 HARVEST TUBE M1226 0050 51...
Страница 59: ...FIGURE 12 THERMOWELL M1226 0050 52...
Страница 60: ...FIGURE 13 FOAM PROBE M1226 0050 53...
Страница 61: ...FIGURE 14 BAFFLE INSTALLATION M1226 0050 54...
Страница 62: ...FIGURE 15 SIDE PORTS M1226 0050 55...
Страница 63: ...FIGURE 16 pH PROBE INSTALLATION M1226 0050 56...
Страница 64: ...FIGURE 17 D O PROBE PHOENIX INSTALLATION M1226 0050 57...
Страница 65: ...FIGURE 18 D O PROBE INGOLD INSTALLATION M1226 0050 58...
Страница 66: ...FIGURE 19 CONVERSION OF D O PORT TO INOCULATION PORT M1226 0050 59...
Страница 67: ...FIGURE 20 EXHAUST CONDENSER INSTALLATION M1226 0050 60...
Страница 68: ...FIGURE 21 RESTRICTOR IN CONDENSER WATER IN LINE M1226 0050 61...
Страница 69: ...FIGURE 22 DISASSEMBLY OF CONDENSER M1226 0050 62...
Страница 70: ...FIGURE 23 FACTOR AFFECTING pH CONTROL M1226 0050 63...
Страница 86: ...M1226 0050 79...
Страница 87: ...FIGURE 25 BEARING HOUSING ASSEMBLY M1226 0050 80...
Страница 88: ...FIGURE 26 BEARING HOUSING IN STERILIZATION M1226 0050 81...
Страница 89: ...M1226 0050 82...
Страница 90: ...M1226 0050 83...
Страница 91: ...M1226 0050 84...
Страница 92: ...M1226 0050 85...