CHAPTER 3
PREPARATION AND OPERATION
3.1
CLEANING OF VESSEL
1.
Fill the vessel with a mild detergent and water solution. Let stand for one hour
then scour thoroughly. Use a brush on both inside and outside surfaces.
2.
Drain the vessel and rinse several times with tap water. Repeat rinsing with
distilled water and let dry.
3.2 VESSEL
ASSEMBLY
1.
Slide impellers on the shaft of the bearing housing and clamp them down.
Lower impeller should be positioned about 1/4 inch above the bottom of the
baffle. Upper impeller one to one and half impeller diameters above lower
impeller
(Fig.
8).
Working From the Underside of the Headplate (Fig. 9)
2.
Insert the sparger tube in the sparger port (Fig. 10).
3.
Insert the harvest tube in the harvest port (Fig. 11).
Working From the Top of the Headplate
4.
Insert the thermowell tube into the temperature port* (Fig. 12).
5.
Insert the sampler assembly into the sample port (Fig. 2).
6.
Install foam probe in the headplate (Fig. 13).
7.
Install the baffle assembly inside of the glass jar by pressing the two edged
baffle together (Fig. 14).
8.
Install four polypropylene ports or plugs in the wall of the glass jar. Be sure to
use a blind plug when a port is not in use (Fig. 15).
9.
Lubricate the headplate O-ring with silicone grease.
10.
Place the headplate on the flange of the vessel and lock it to the clamping ring
with
knurled
screws.**
11.
Install pH and DO probes (Fig. 16, 17, 18).*** Coat probe with glycerin
M1226-0050 8
Содержание BIOFLO III
Страница 2: ......
Страница 7: ......
Страница 9: ...M1226 0050 2...
Страница 37: ...M1226 0050 30...
Страница 40: ...M1226 0050 33...
Страница 48: ...FIGURE 1 VESSEL SCHEMATIC M1226 0050 41...
Страница 49: ...FIGURE 2 SAMPLING SYSTEM M1226 0050 42...
Страница 50: ...FIGURE 3 FLOWMETER CONVERSION M1226 0050 43...
Страница 51: ...FIGURE 4 FRONT PANEL M1226 0050 44...
Страница 52: ...FIGURE 5 REAR OF CABINET M1226 0050 45...
Страница 53: ...FIGURE 6 SWITCH PANEL M1226 0050 46...
Страница 54: ...FIGURE 7 EXTERNAL NUTRIENT PUMP TERMINAL M1226 0050 47...
Страница 55: ...FIGURE 8 SUGGESTED IMPELLER LOCATION M1226 0050 48...
Страница 56: ...FIGURE 9 HEADPLATE M1226 0050 49...
Страница 57: ...FIGURE 10 SPARGER TUBE M1226 0050 50...
Страница 58: ...FIGURE 11 HARVEST TUBE M1226 0050 51...
Страница 59: ...FIGURE 12 THERMOWELL M1226 0050 52...
Страница 60: ...FIGURE 13 FOAM PROBE M1226 0050 53...
Страница 61: ...FIGURE 14 BAFFLE INSTALLATION M1226 0050 54...
Страница 62: ...FIGURE 15 SIDE PORTS M1226 0050 55...
Страница 63: ...FIGURE 16 pH PROBE INSTALLATION M1226 0050 56...
Страница 64: ...FIGURE 17 D O PROBE PHOENIX INSTALLATION M1226 0050 57...
Страница 65: ...FIGURE 18 D O PROBE INGOLD INSTALLATION M1226 0050 58...
Страница 66: ...FIGURE 19 CONVERSION OF D O PORT TO INOCULATION PORT M1226 0050 59...
Страница 67: ...FIGURE 20 EXHAUST CONDENSER INSTALLATION M1226 0050 60...
Страница 68: ...FIGURE 21 RESTRICTOR IN CONDENSER WATER IN LINE M1226 0050 61...
Страница 69: ...FIGURE 22 DISASSEMBLY OF CONDENSER M1226 0050 62...
Страница 70: ...FIGURE 23 FACTOR AFFECTING pH CONTROL M1226 0050 63...
Страница 86: ...M1226 0050 79...
Страница 87: ...FIGURE 25 BEARING HOUSING ASSEMBLY M1226 0050 80...
Страница 88: ...FIGURE 26 BEARING HOUSING IN STERILIZATION M1226 0050 81...
Страница 89: ...M1226 0050 82...
Страница 90: ...M1226 0050 83...
Страница 91: ...M1226 0050 84...
Страница 92: ...M1226 0050 85...