![NEW BRUNSWICK SCIENTIFIC BIOFLO III Скачать руководство пользователя страница 16](http://html1.mh-extra.com/html/new-brunswick-scientific/bioflo-iii/bioflo-iii_manual-to-operations_1677096016.webp)
before inserting into the port in the headplate.****
12.
Insert exhaust condenser into the exhaust condenser port. Connect the
exhaust filter on the top of the condenser with flexible tubing (Fig. 20).
13.
Slide 2" long, 1/4" inside diameter silicone tubing on the top of the sparger
tube, then connect air filter to it (Fig. 10).
NOTES:
*
Add a few drops of glycerin into the thermowell tube before inserting
RTD.
**
Do not overtighten the clamping ring to the headplate. Same to the
clamping screws for the glass tube reactor and the vessel base
(vessel
heater).
***
When the inoculation port is used for installation of Phoenix DO
probe, the DO port is converted to the inoculation port (Fig. 19).
**** Membrane of the probe must be free of glycerin.
3.3
PREPARATION BEFORE STERILIZATION
Before sterilization, perform the following procedure:
1.
Fill vessel with water to its working volume.
2.
Place the vessel assembly on the three pins located in the base of the cabinet.
3.
Position the motor assembly on the top of the bearing housing. Connect the
motor cable to the receptacle on the face of the cabinet.
4.
Connect cables from all probes (pH, DO and antifoam) to their respective
sockets on the front face of the cabinet.
Ground lead from the antifoam socket is to be connected to the ground pin
on
the
headplate.
5.
Insert RTD in the thermowell on the headplate and connect it to the socket
on
the
cabinet.
6.
Connect the inlet filter on the top of the sparger tube to the hose barb in the
face of the cabinet with flexible tubing.
7.
Connect water line to rear of the cabinet. Adjust water pressure to 20 PSIG
max.
M1226-0050 9
Содержание BIOFLO III
Страница 2: ......
Страница 7: ......
Страница 9: ...M1226 0050 2...
Страница 37: ...M1226 0050 30...
Страница 40: ...M1226 0050 33...
Страница 48: ...FIGURE 1 VESSEL SCHEMATIC M1226 0050 41...
Страница 49: ...FIGURE 2 SAMPLING SYSTEM M1226 0050 42...
Страница 50: ...FIGURE 3 FLOWMETER CONVERSION M1226 0050 43...
Страница 51: ...FIGURE 4 FRONT PANEL M1226 0050 44...
Страница 52: ...FIGURE 5 REAR OF CABINET M1226 0050 45...
Страница 53: ...FIGURE 6 SWITCH PANEL M1226 0050 46...
Страница 54: ...FIGURE 7 EXTERNAL NUTRIENT PUMP TERMINAL M1226 0050 47...
Страница 55: ...FIGURE 8 SUGGESTED IMPELLER LOCATION M1226 0050 48...
Страница 56: ...FIGURE 9 HEADPLATE M1226 0050 49...
Страница 57: ...FIGURE 10 SPARGER TUBE M1226 0050 50...
Страница 58: ...FIGURE 11 HARVEST TUBE M1226 0050 51...
Страница 59: ...FIGURE 12 THERMOWELL M1226 0050 52...
Страница 60: ...FIGURE 13 FOAM PROBE M1226 0050 53...
Страница 61: ...FIGURE 14 BAFFLE INSTALLATION M1226 0050 54...
Страница 62: ...FIGURE 15 SIDE PORTS M1226 0050 55...
Страница 63: ...FIGURE 16 pH PROBE INSTALLATION M1226 0050 56...
Страница 64: ...FIGURE 17 D O PROBE PHOENIX INSTALLATION M1226 0050 57...
Страница 65: ...FIGURE 18 D O PROBE INGOLD INSTALLATION M1226 0050 58...
Страница 66: ...FIGURE 19 CONVERSION OF D O PORT TO INOCULATION PORT M1226 0050 59...
Страница 67: ...FIGURE 20 EXHAUST CONDENSER INSTALLATION M1226 0050 60...
Страница 68: ...FIGURE 21 RESTRICTOR IN CONDENSER WATER IN LINE M1226 0050 61...
Страница 69: ...FIGURE 22 DISASSEMBLY OF CONDENSER M1226 0050 62...
Страница 70: ...FIGURE 23 FACTOR AFFECTING pH CONTROL M1226 0050 63...
Страница 86: ...M1226 0050 79...
Страница 87: ...FIGURE 25 BEARING HOUSING ASSEMBLY M1226 0050 80...
Страница 88: ...FIGURE 26 BEARING HOUSING IN STERILIZATION M1226 0050 81...
Страница 89: ...M1226 0050 82...
Страница 90: ...M1226 0050 83...
Страница 91: ...M1226 0050 84...
Страница 92: ...M1226 0050 85...