![Netscout aircheck G2 Скачать руководство пользователя страница 74](http://html1.mh-extra.com/html/netscout/aircheck-g2/aircheck-g2_user-manual_1674708074.webp)
Verifying Connectivity and Coverage
61
Figure 42. The Connect to Network Screen
Signal Level:
The measured real-time signal level.
Noise Level:
The measured real-time noise level.
SNR:
The measured real-time signal-to-noise ratio.
Retry Rate:
The percentage of transmitted frames that are
retry frames.
Reviewing User-Defined Test Target Results
While the Connection test is still running, the Target Test
fields displays:
Once the test finishes, the field turns
green
if successful.
Figure 43. Connection Test Target Results