© by NECTA VENDING SOLUTIONS SpA
22
01-2003 197 00
PRINTED BOARD FUNCTIONS
AND INDICATOR LIGHTS
CONTROL BOARD
This board, placed at the back of the machine, (see Fig.
16) processes the information from the push-buttons and
from the payment system; it also controls the actuations
and the push-button board.
The 15 V AC voltage required for board operation is
supplied by a transformer which is protected by a 125 mAT
fuse on the primary and by a 1.25 AT fuse on the second-
ary winding. The voltage supply is rectified and stabilised
directly by the board.
The board also houses the EPROM (see Fig. 16).
- the yellow LED indicates the presence of 12 V DC;
- the green LED blinking indicates that the microprocessor
is working correctly;
- the red LED indicates the operating status of the boiler
heating element.
Fig.16
1 - 230 V~ power users
2 - RAM
3 - EPROM
4 - Input signal
5 - Green LED
6 - Not used
7 - To the push-button board
8 - Expansion board for payment systems (optional)
9 - Green LED
10 - Board power supply
11 - Red LED
12 - TRIAC for the boiler heating element
13 - To boiler heating element
14 - 230 V~ power users
15 - Relays
16 - Control board
17 - Transformer fuse
18 - Network fuses
S
I
A
L
E
R
O
S
S
E
R
P
S
E
T
N
A
T
S
N
I
1
K
R
E
3
E
2
K
C
S
E
3
D
M
3
K
C
A
M
2
F
M
4
K
M
P
A
I
E
/
M
P
5
K
M
4
D
M
6
K
2
V
E
2
V
E
7
K
1
V
E
1
V
E
8
K
1
F
M
1
F
M
9
K
Z
D
M
Z
D
M
0
1
K
2
D
M
2
D
M
1
1
K
2
D
M
1
D
M
2
1
K
A
I
E
A
I
E
3
1
K
B
C
S
M
B
C
S
M
4
1
K
B
S
M
B
S
M
5
1
K
P
S
M
P
S
M
Содержание Colibri
Страница 2: ......
Страница 4: ......
Страница 40: ...Sx35401...
Страница 41: ...Colibr Espresso...
Страница 42: ...Sx35600 Sx35600...
Страница 43: ...Colibr Colibr Instant Instant...
Страница 44: ...by NECTA VENDING SOLUTIONS SpA NOTE...
Страница 45: ...by NECTA VENDING SOLUTIONS SpA NOTE...
Страница 46: ...by NECTA VENDING SOLUTIONS SpA NOTE...
Страница 48: ......