© by N&W GLOBAL VENDING S.p.A.
1
10 2009 3325 - 00
English
TABLE OF CONTENTS
PAGE PAGE
D
eclaration
of
conformity
W
arnings
INTRODUCTION
2
i
Dentification
of
the
machine
2
t
ransport
anD
storage
2
p
ositioning
of
the
venDing
machine
3
T
echnical
feaTures
3
v
ariable
combination
lock
5
a
ccessories
5
FILLING AND CLEANING
6
D
oor
sWitch
6
h
ygiene
anD
cleaning
6
U
sing
the
Dispensers
6
c
onTrols
and
informaTion
7
l
oaDing
7
c
leaning
9
INSTALLATION 12
U
npacking
the
venDing
machine
12
p
late
insertion
13
e
lectrical
connection
14
f
illing
the
Water
circUit
15
s
anitising
mixers
anD
fooD
circUits
for
the
first
time
15
o
peraTion
16
c
ompartment
cover
16
c
Up
sensor
16
s
tirrer
sUgar
Dispenser
17
e
spresso
Unit
17
a
Utomatic
grinDing
regUlation
19
s
etUp
21
i
nstant
Dispensing
cycle
22
PROGRAMMING 23
n
avigation
24
D
isplay
24
k
eyboarD
24
p
oWer
on
25
n
ormal
operation
moDe
25
MAINTENANCE 46
B
rewer
mainTenance
46
p
eriodical
operaTions
47
s
anitising
47
c
Up
Dispenser
49
p
roDUct
containers
49
b
oiler
m
aintenance
50
b
oiler
heat
protection
50
Board funcTion
52
e
lectronic
boarD
configUration
52
c.p.U.
boarD
53
a
ctUation
boarD
54
i
nstant
boiler
control
relay
54
w
aTer
circuiT
55
p
rogramming
summary
55
w
iring
diagram
57
Содержание Canto Plus Espresso
Страница 1: ...INSTALLATION OPERATION MAINTENANCE EN English DOC NO H 3325EN 01 EDITION 2 10 2009 Canto Plus Espresso...
Страница 2: ......
Страница 5: ......
Страница 6: ......
Страница 63: ...by N W GLOBAL VENDING S p A 57 01 2013 3325 01 APPENDIX WIRING DIAGRAMS...
Страница 72: ......