![Neco STIR-RITE Скачать руководство пользователя страница 4](http://html1.mh-extra.com/html/neco/stir-rite/stir-rite_owners-operators-manual_3808455004.webp)
4
Table of Contents
GENERAL STATEMENTS.................................................................................................................2
WARRANTY.......................................................................................................................................3
SAFETY ............................................................................................................................................ 5
Warning Labels .......................................................................................................................... 7
EQUIPMENT OVERVIEW .............................................................................................................. 11
ASSEMBLY AND INSTALLATION .................................................................................................. 12
Preliminary Assembly .............................................................................................................. 12
Clearance Setup for Bins 21’ in Diameter and Smaller ....................................................... 12
Track Installation .................................................................................................................. 13
Rail Beam Assembly ............................................................................................................ 14
Trolley Locations .................................................................................................................. 15
Assemble the Double Sprocket ........................................................................................... 19
Assembly the Drive Cluster ................................................................................................. 19
Attaching the Take-up Assembly .......................................................................................... 19
Installing the Chain Draft Link .............................................................................................. 21
Attaching the Motor to the Main Trolley ............................................................................... 22
Installing the Pivot Assembly ............................................................................................... 25
Installing the Rotating Contactor Assembly ......................................................................... 26
Installing the Cable Tender Assembly .................................................................................. 27
Attaching the Cords ............................................................................................................. 27
Installing the Stir-Rite System ................................................................................................. 32
Raising the Stir-Rite Assembly ............................................................................................ 32
Hanging the Stir-Rite Assembly ........................................................................................... 33
Assembling the Down Augers .............................................................................................. 34
Installing the Disconnect Switch .......................................................................................... 37
Prepare for Start-Up ............................................................................................................ 38
Check Ladder Clearance ..................................................................................................... 38
STIR-RITE START-UP AND OPERATION ..................................................................................... 39
Start-up .................................................................................................................................... 39
Operation ................................................................................................................................. 39
Operating Instructions ......................................................................................................... 39
Filling ................................................................................................................................... 39
Tilt Switch - Overview & Adjustment ................................................................................... 41
Restarting after 48 Hours of Nonuse ....................................................................................... 42
MAINTENANCE ............................................................................................................................. 44
APPENDIX ..................................................................................................................................... 45
STIR-RITE SYSTEM—GENERAL OVERVIEW ...................................................................... 46
REPLACEMENT PARTS ......................................................................................................... 49
Содержание STIR-RITE
Страница 23: ...23 Figure 18 Main Trolley Assembly Main Trolley Motor Mount 3 2 Motor Pulley Beam...
Страница 24: ...24 Cord Connections to Motors Figure 19 Cord Connections to Single or Multiple Down Augers...
Страница 45: ...45 APPENDIX...
Страница 46: ...46 Stir Rite System General Overview...
Страница 48: ...48 This page is intentionally left blank...
Страница 49: ...49 REPLACEMENT PARTS...
Страница 52: ...52 Stir Rite System Pivot Assembly...
Страница 54: ...54 Stir Rite System Main Trolley...
Страница 56: ...56 Stir Rite System Auxiliary Trolley...